Chorrera Power Project | Accountability Console
Complaints IAMs Register Login

Loading...

Chorrera Power Project

Issues

Community health and safety

Description: Complaint raises concerns related to public health and safety including incidents of or an increase in accidents, release of hazardous materials, and spread of diseases. Concerns related to retaliation and/or violence are not included.

Complaints with this Issue: 363

Browse Complaints

Due diligence

Description: Complaint raises concerns about inadequate or absent prior investigation of project impacts.

Complaints with this Issue: 486

Browse Complaints

Environmental

Description: Complaint raises concerns regarding environmental impacts that do not refer specifically to water, pollution, or biodiversity.

Complaints with this Issue: 408

Browse Complaints

Pollution

Description: Complaint raises concerns about releases of pollutants related to the project, including hazardous or non-hazardous chemicals, minerals, metals, pathogens, odors, noise, vibration, radiation, light, and heat.

Complaints with this Issue: 229

Browse Complaints

Sectors

Energy

Description: Project relates to energy access, legal frameworks regarding the energy sector, and development and operation of energy infrastructure, including power generation and electric and gas distribution and storage. Projects specifically related to the extraction of oil and gas are not included.

Complaints in this Sector: 353

Browse Complaints

Infrastructure

Description: Project relates to construction or improvement of large structures, facilities, or public works projects. Examples include roads and other transportation projects, sanitation and water treatment facilities, power plants, and industrial facilities.

Complaints in this Sector: 994

Browse Complaints

Project

Name: Chorrera Power Project

Investments: IDB PN0136

Client:

Support:

Country: Panama

Complaint

IAM: Independent Consultation and Investigation Mechanism (MICI)

ID: MICI-BID-PN-2021-0163

Date Filed: Jan. 27, 2021

Date Closed: Feb. 3, 2021

Status: Closed Without Outputs

Description

The complaint was filed by a resident of the neighborhood of El Naranjal, district of La Chorrera, Panama. It describes the environmental and health impacts on the residents of the El Naranjal neighborhood resulting from the construction and operation of the Pan-Am Generating Ltd. thermoelectric plant, which was financed by the IDB. Specifically, the requester states that the project does not comply with the proper environmental safety measures and that it produces noise pollution, vibrations, and toxic gases that have seriously affected the population of the area since the early 2000s, when the plant began operating. It also alleges direct health effects, mainly in children, due to exposure to contaminants that have caused skin, eye, and respiratory diseases. On February 3, 2021, the Request was not registered as it related to one of the exclusions provided in paragraph 19 of the MICI-IDB Policy, specifically exclusion 19 literal (f) regarding Requests that are submitted more than 24 months after the last disbursement of the corresponding operation financed by the Bank. According to the Bank's records, the last disbursement of the Project occurred on January 30, 2002. It is important to note that this Notification of Non-Registration is not an assessment of the merits of the Request or the issues presented in it, nor is it a determination of compliance or non-compliance by the IDB with respect to its Operational Policies.

Complaint Stages

Filing

Jan. 27, 2021

Filing

Status:

Start Date: Jan. 27, 2021

Registration

Closed Without Output

Registration

Status: Closed Without Output

Explanation: Funding and/or consideration ended, Complaint filed more than 24 months after last disbursement

Eligibility

Not Undertaken

Eligibility

Status: Not Undertaken

Explanation: Case closed in earlier stage, Complaint was originally found ineligible or not registered

Dispute Resolution

Not Undertaken

Dispute Resolution

Status: Not Undertaken

Explanation: Case closed in earlier stage, Complaint was originally found ineligible or not registered

Compliance Review

Not Undertaken

Compliance Review

Status: Not Undertaken

Explanation: Case closed in earlier stage, Complaint was originally found ineligible or not registered

Has Compliance Report: No

Non-Compliance Found: No

Monitoring

Not Undertaken

Monitoring

Status: Not Undertaken

Explanation: Case closed in earlier stage, Complaint was originally found ineligible or not registered

Closed

Feb. 3, 2021