DocSearch | Accountability Console
Complaints IAMs Register Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

20 Results

Showing Only Management Response, WB Inspection Panel (Show All Results)

Top Results By:

  1. Complaint > Greater Beirut Water Supply Project

    Management Response: 71-Management Commissioned Studies-Technical Review of Source Water Quantity

    ...unknown are on the left: Inflows – Losses = Increase in Storage + Known Outflows The left hand side “Inflows – Losses” is a single quantity and the two subcomponents cannot be separated as the losses are unknown. The left‐hand side can be characterized as “net inflows” since it represents flows inclusive of losses. The principle in this simple case also applies when computing a water balance for a more complex system. c) Canal 800 Canal 800 is not included in this review because the pla...

    WB Inspection Panel - Lebanon - 2010
  2. Complaint > Mine Closure and Social Mitigation Project

    Management Response: 39-Management Response (English)

    ...unknown to the mine closure contractor until the slippage. As a result, a modification to the waste dump closure design was required. A series of options was considered and a risk assessment was conducted by international experts in 2003. The designer prepared a new design and submitted it to the CGMC for review and approval in December 2003. The modification included a requirement to move at least 43,000m3 of material from the dump, re-profiling of the upper flanks of the waste dump, and constr...

    WB Inspection Panel - Romania - 2006
  3. Complaint > Greater Beirut Water Supply Project

    Management Response: 71-Management Commissioned Studies-Project Cost Estimates, Financial and Economic Analyses

    ...unknown, and Bank experience with high dams in karsitic environments signaled significant geological risks and a high risk that the pre-feasibility cost estimates would need significant upward revision46; and (iii) additional raw water sources were known to be needed in a second stage project, and moving forward with the Awali option did not foreclose later development of the Damour. OP 10.04 asks that Bank teams, when considering alternatives, take starting dates into account (para. 3). It high...

    WB Inspection Panel - Lebanon - 2010
  4. Complaint > West African Gas Pipeline Project

    Management Response: 40-Management Report and Recommendation (English)

    ...unknown. 4 Management Report and Recommendation - The size of the displaced population seems to be underestimated as a result of the methodology used for their identification. - Bank Management failed to ensure that the Sponsor performed an adequate analysis of socio-economic risks to vulnerable people. This does not comply with OP 4.12, and denied these people protections provi...

    WB Inspection Panel - Ghana, Nigeria - 2006
  5. Complaint > Land Management and Administration Project

    Management Response: 60-Management Response (English)

    ...unknown”. This appears to be the classification that is generally used when State Public Land is encountered during the titling process as well as when land is subject to a dispute that cannot be resolved during the titling process at the field level. • On the basis of information currently available, it seems that only one title was issued in the name of the State as a result of the systematic adjudication process. Management understands that one title wa...

    WB Inspection Panel - Cambodia - 2009
  6. Complaint > Power VI Project

    Management Response: Management Response (English)

    ...unknown significant areas t o be avoided. L An overview of the proposed development activities, mitigative measures and residual impact of the rating for each parameter of the human environment is presented in Table 2. ' \ Environmental Impact Assessment of the Proposed Songo Songo December 19. Gas Development Project ...

    WB Inspection Panel - Tanzania - 1995
  7. Complaint > Parana Biodiversity Project

    Management Response: 41-Management Response (English)

    ...unknown origin, but that the area is in the process of regeneration. On April 3, 2006, the Federal Government established a 16,582 hectare Wildlife Refuge in the area. The PBP has supported discussion with farmers and civil society on the importance of the area’s biodiversity, increased fire protection and improved enforcement of the new protected area. 58. The findings and recommendations of the Technical Audit are intended to feed into the results of the Mid-Term Review. The Technical Au...

    WB Inspection Panel - Brazil - 2006
  8. Complaint > Yacyreta Hydroelectric Project

    Management Response: Management Response (English)

    ...unknown and prior to Bank involvement. These are the only Mbya people known to have been residlent on the island(s) of the Paraná river. In 1987, the Bank received a request fiom the IEpiscopal Confcrence of Paraguay, on behalf of the Mbya families, to consider them u having been displaced by the Yacyretá Project because they had fled the island to problems with authorities when they learned of the construction of the dam. Foliowing meetings ...

    WB Inspection Panel - Argentina, Paraguay - 1996
  9. Complaint > Transport Sector Support Project and its Additional Financing

    Management Response: Management Response

    ...Unknown number of Webuye interchange through (looking at participants – varied. cracked houses, etc.) January 23 and 24, Meeting to discuss is- Task Team and Re- Park Villa Webuye In- 2019: sues of concern and pro- questers terchange posed way forward 41 Kenya ...

    WB Inspection Panel - Kenya - 2018
  10. Complaint > West African Gas Pipeline Project

    Management Response: 40-Management Response (English)

    ...unknown. These mechanism. lands are our ancestral lands and we Compensation rates for all immovable assets and improvements cannot leave it to total strangers while include consideration of future income streams (RAP page 5-23). moving to some other location to reside. Future profits should have been considere...

    WB Inspection Panel - Ghana, Nigeria - 2006
  11. Complaint > Petroleum Development and Pipeline Project, and Petroleum Environment Capacity Enhancement Project

    Management Response: 27-Management Response (English)

    ...unknown mechanism in Cameroon and that the learning and adjustment process needed to be completed before FEDEC could become the effective tool it is meant to be. FEDEC now has a place in the institutional landscape for environmental management in Cameroon and further actions are being taken and/or prepared to strengthen its activities. 29. An international consultant will be contracted by end November 2002 to start a comprehensive training program for all staff of CPSP and sectoral ministrie...

    WB Inspection Panel - Cameroon - 2002
  12. Complaint > Third Power Project, Fourth Power Project, and proposed Bujagali Hydropower Project

    Management Response: 24-Management Response (English)

    ...unknown. Hence no prior EIAs were done for the Old Owen Falls Dam. This is further compounded by the fact that to date no post-construction EIA has been done for the old Owen Falls Dam.” RESPONSE: 53. IDA conducted environmental and social analyses of Owen Falls Extension in 1990, consistent with the intent of OMS 2.36 on Environmental Aspects of Bank Work, May 1984. OD 4.00 (1989) was not applicable because the Power III Project was initiated in 1988. IDA subsequently conducted ...

    WB Inspection Panel - Uganda - 2001
  13. Complaint > Second Rural Enterprise Support Project

    Management Response: 89-Management Response and Addendum (English)

    ...unknown. In addition at the project level. Management recognizes the need to to Navruz, there were several tragic deaths. expand RESP II’s labor provisions to include adequate Igor Yachkevskiy, a 55-year old resident of measures against forced labor and will also incorporate this Tashkent city, died of a heart attac...

    WB Inspection Panel - Uzbekistan - 2013
  14. Complaint > Proposed Kosovo Power Project and Second Additional Financing Energy Sector Clean-up and Land Reclamation Project

    Management Response: 103-Management Response

    ...unknown capacity (refer page 39) 17. ISSUE: 2004 Emergency Displacement is a legacy issue for the The resettlement for the 2004 emergency displacement KPP that must be addressed. was carried out by UNMIK and PISG and was not part of any Bank-supported project. CLAIM: Livelihoods of 158 families (664 people) affected by 2004 Emergency Displacem...

    WB Inspection Panel - Kosovo - 2015
  15. Complaint > Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing

    Management Response: 102 - Management Response (English)

    ...unknown guard the consultation meeting. The Bank team promptly requested the whether and how stakeholder Policies, PMU to remedy this. The PMU was very responsive and agreed to comments were taken into includ- extend the closing date to receive comments from November 28 to consideration in further devel- ing but December 5, 2014. opment of those ToR. not lim- ited to Management notes that the revised ToR for t...

    WB Inspection Panel - Mongolia - 2015
  16. Complaint > Rio Bogota Environmental Recuperation and Flood Control Project

    Management Response: 108-Management Response(English)

    ...unknown. The transfer of curies and be used. It should be noted that during construction, some the number and way of life of this species in the reserve have fauna will be able to relocate naturally (e.g., some birds, not been analyzed by CAR. etc.). The suggestions in the Request will b...

    WB Inspection Panel - Colombia - 2016
  17. Complaint > Private Power Generation Project

    Management Response: 44-Management Response (English)

    ...unknown whether Lake Victoria will recharge to the change on power development options in the Nile Equato- high levels and outflow experienced during the 1961- rial Region, including Bujagali. The analysis, using the 2000 period. It is also not known whether such a best available General Circulation Models (GCM), exam- recharge will occur in the next few years or in the ined the impacts of a range of changes in temperature on next 100 ye...

    WB Inspection Panel - Uganda - 2007
  18. Complaint > Lima Urban Transport Project

    Management Response: 61-Management Response (English)

    ...unknown to the Bank. In July 2009, the Bank requested Protransporte to post the EIA on its website again, which was done. In terms of disclosure through the Bank’s Infoshop, a summary of the EIA in English was posted during the appraisal process. Management agrees that this did not meet the require- ...

    WB Inspection Panel - Peru - 2009
  19. Complaint > National Drainage Program Project

    Management Response: 34-Management Response (English)

    ...Unknown 19. Committee Report on Damages to Cholri Weir in June 1998 and Tidal Link During May 1999 Cyclone to the Additional Chief Secretary, Government of Sindh, Chief Engineer and Project Director (South) WAPDA, October, 2000 20. Physical Monitoring Left Bank Out Fall Drain Stage I Project Under National Drainage Programme, (Two Volumes), SCARPs Monitoring (South) WAPDA, Hyderabad, December 2000. 21. Project Completion Report, Left Bank Outfall Drain Project (ADB Loan No. 700- ...

    WB Inspection Panel - Pakistan - 2004
  20. Complaint > Private Power Generation Project

    Management Response: 44-Management Report and Recommendation

    ...unknown, based on currently available data and information, whether cumulative effects on health and educational services or on cultural/spiritual sites might be identified. It seems unlikely that there are cumulative effects on white-water rafting, as these activities are not believed to have been commercially available a...

    WB Inspection Panel - Uganda - 2007