Contact Us
×Thank you for taking the time to help us improve the Console.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Loading...
Bangladesh Bhola IPP Project
Sectors
Issues Raised
Project Information
Investment ID: 000057
Bank: Asian Infrastructure Investment Bank
Environmental Category: B
Country: Bangladesh
Region: South Asia
Approval Date: None
Investment Types: Loans
Total Project Cost: No recorded data on this
Total Complaints: 1
Description
The project will be developed by Shapoorji Pallonji Infrastructure Capital Company Private Limited through Nutan Bidyut (Bangladesh) Limited (NBBL), a special purpose vehicle incorporated in Bangladesh for the sole purpose of developing and operating the project. The 220 MW power plant will include two gas turbine generators, two heat recovery steam generators and one steam turbine generator along with the balance of the plant, including facilities for fuel gas transportation, compression and conditioning system, high-speed diesel storage, cooling water system and water treatment facility. Power will be evacuated through the proposed gas insulated switchyard of the proposed plant to the existing 230 kV air insulated switchyard to Barisal substation through the existing 230 kV transmission line. A gas pipeline of around 5 kilometers from the Shahbazpur gas field to the project site alongside the existing pipeline will be constructed.
Investments
Investment Type | ID | Amount | Status | Bank | Client |
---|---|---|---|---|---|
Loans | 000057 | USD 60.0 million | Active | AIIB |
Related Complaints
Asian Infrastructure Investment Bank PPM Complaints | IAM | Country | Date Filed | Status |
---|---|---|---|---|
Bangladesh Bhola IPP Project | AIIB PPM | Bangladesh | 08/04/2022 | Closed Without Outputs |