Kathmandu Valley Water Distribution, Sewerage, and Urban Development | Accountability Console
Complaints IAMs Register Login

Loading...

Kathmandu Valley Water Distribution, Sewerage, and Urban Development

Sectors

Infrastructure

Description:

Projects in this Sector: 592

Browse Projects

Issues Raised

Procurement

Description:

Projects with this Issue Raised: 79

Browse Projects

Unknown

Description:

Projects with this Issue Raised: 727

Browse Projects

Project Information

Investment ID: 4893-NEP

Bank: Asian Development Bank

Environmental Category: Unknown

Country: Nepal

Region: South Asia

Approval Date: Dec. 13, 2006

Investment Types: Advisory services

Total Project Cost: USD 3.8 million

Total Complaints: 1

Description

Given the increasing urban population, basic urban services needs is also increasing at the rapid pace in the Kathmandu Valley. Considering this rapid urbanization, it is essential that the urban areas in Nepal prepare a long term strategy and investment/financing plan to meet the required urban basic services needs including water supply, wastewater management, urban transport, and solid waste management services. Under the ongoing ADB's Melamchi Water Supply Project (MWSP) and Kathmandu Valley Water Services Sector Development Program (KVWSSDP), water supply and wastewater management services in the Kathmandu Valley are being improved. In particular, the KVWSSDP supports institutional reforms in the water supply and sanitation (WSS) sector in the Kathmandu Valley by establishing the Water Utility Operator (WUO) which will be managed by a competitively selected private sector form through a performance based management contract.

Investments

Investment Type ID Amount Status Bank Client
Advisory services 4893-NEP USD 2.2 million Planned ADB

Related Complaints