Contact Us
×Thank you for taking the time to help us improve the Console.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Loading...
Nepal: South Asia Subregional Economic Cooperation Mugling-Pokhara Highway Improvement Phase 1 Project
Sectors
Issues Raised
Project Information
Investment ID: 52097-002
Bank: Asian Development Bank
Environmental Category: B
Country: Nepal
Region: South Asia
Approval Date: Oct. 29, 2019
Investment Types: Loans, Other
Total Project Cost: USD 254.5 million
Total Complaints: 1
Description
The project road is the primary access link of Pokhara to Kathmandu and is a major feeder road of two SASEC corridors linking Kathmandu to Dhaka (Bangladesh) and Kolkata (India) through Mugling and the East-West Highway. It is a two-lane carriageway that handles about 7,400 vehicles per day, including 14% of goods vehicles and up to 55% of motorcycles in urban areas. Traffic is forecast to increase to 13,000 vehicles per day by 2040, and the rising number of motorcycles creates significant road safety risks, notably as (i) the road winds through the mid-hill region of Nepal and its geometry can be improved, (ii) slow-moving vehicles and pedestrians are not segregated in urban areas, and (iii) the pavement is in poor condition. The road will be widened to four lanes to cater to increasing demand, and design standards will feature enhanced geometry, pavement, structure, drainage, safety, and intelligent traffic system features to improve sustainability, safety awareness, and safety compliance.
Investments
Investment Type | ID | Amount | Status | Bank | Client |
---|---|---|---|---|---|
Loans, Other | 52097-002 | USD 195.5 million | Active | ADB | The Government of Nepal: Ministry of Physical Infrastructure and Transport |
Related Complaints
Asian Development Bank SPF CRP Complaints | IAM | Country | Date Filed | Status |
---|---|---|---|---|
South Asia Subregional Economic Cooperation Mugling-Pokhara Highway Improvement Phase 1 Project | ADB SPF CRP | Nepal | 10/11/2022 | Closed With Outputs Outside Process |