Power Transmission and Distribution Efficiency Enhancement Project | Accountability Console
Complaints IAMs Register Login

Loading...

Power Transmission and Distribution Efficiency Enhancement Project

Sectors

Energy

Description:

Projects in this Sector: 232

Browse Projects

Issues Raised

Community health and safety

Description:

Projects with this Issue Raised: 359

Browse Projects

Environmental

Description:

Projects with this Issue Raised: 387

Browse Projects

Other

Description:

Projects with this Issue Raised: 215

Browse Projects

Project Information

Investment ID: 50059-002

Bank: Asian Development Bank

Environmental Category: B

Country: Nepal

Region: South Asia

Approval Date: June 29, 2017

Investment Types: Advisory services, Loans

Total Project Cost: USD 152.0 million

Total Complaints: 1

Description

Electricity is a necessary requirement for accelerating the economic development of any country and is considered an important input to improve quality of life. Overall, the electricity demand has far outgrown the supply, leading to load curtailment and increased dependence on imports from India in recent times. The peak suppressed demand in Nepal in FY20132014 has been around 1,200 megawatt (MW) as against installed capacity of 787 MW, hence resulting in a deficit of about 440 MW due to non-availability of generation. Government has plans to generate additional 10,000 MW in the next 10 years. About 63% of the population in Nepal has access to electricity but the supply quality is unreliable and inadequate. The government has recognized the immediate need for reinforcement and upgrade of outdated distribution systems crucial to deliver the required energy to the customers even if the generation and transmission lines are in place.

Investments

Related Complaints

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Nepal Electricity Authority (NEA)