Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

26 Results

Showing Only ADB Special Project Facilitator and Compliance Review Panel (Show All Results)

Top Results By:

  1. Complaint > Delhi-Meerut Regional Rapid Transit System Investment Project

    Dispute Resolution: Review and Assessment & Problem-Solving Report

    ...climate change mitigation, resulting in a livable city environment. 2. The proposed RRTS (Delhi–Ghaziabad–Meerut) corridor connecting Delhi with Meerut in Uttar Pradesh will be a rapid railway system, built on elevated viaducts and underground in heavily populated areas. As per the final alignment, out of the total length of 82.15 kilometers (km), 14.15 km will be an underground section, and the remaining 68 km will be an elevated section. A stabling yard near Sarai Kale Khan (Jangpura) an...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2025
  2. Complaint > Visayas Base-Load Power Project

    Monitoring: 1st Annual Monitoring Report

    ...changes in the assessment, and in ensuring an adequate grievance redress mechanism and an inclusive consultation process. Regarding the Energy Policy, the CRP found that ADB had decided to finance the coal-fired power plant without first ensuring compliance with social and environmental safeguards. Given these conclusions, the CRP drew up four recommendations to bring the project into compliance. 11. On 2 April 2012, the Board discussed the CRP’s final report and approved its four recomme...

    ADB Special Project Facilitator and Compliance Review Panel - Philippines - 2013
  3. Complaint > Sustainable Urban Transport Investment Program - Tranche 3

    Compliance Report: CRP's Final Report (English)

    ...Climate Change Department SPS – Safeguard Policy Statement TOR – Terms of Reference WBG EHS – 2007 Environmental, Health, and Safety General Guidelines of the (Guidelines) World Bank Group WHO – World Health Organization WEIGHTS AND MEASURES dBA – A-weighted decibels ...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2017
  4. Complaint > North-South Corridor (Kvesheti-Kobi) Road Project

    Compliance Report: CRP's Final Report (English)

    ...climate-resilient bypass road between Kvesheti and Kobi, and about 5 km of climate-resilient all-weather access roads to roadside towns and villages; (ii) the establishment of a Khada Valley visitor center; and (iii) capacity-building of the Roads Department of Georgia on project and contract management. The road construction, which includes 5 tunnels (with the 9-km tunnel being the first and longest in Georgia) and 6 bridges (one of which is an arched bridge), is a greenfield project that ...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2023
  5. Complaint > Clean Energy and Network Efficiency Improvement Project

    Closing Report: Closure Report

    ...change in scope of output made in 2018. Comments and revisions on the DMF 2. The impact statement was reworded as ‘improved national reliability, adequacy and affordability of power supply’ to reflect the desired change. Indicators related to reliability (index to show changes in power outages) and affordability (index to show any change in mean power prices relative to mean national incomes) could have also been included. 3. The outcome statement should reflect the project areas specified...

    ADB Special Project Facilitator and Compliance Review Panel - Sri Lanka - 2021
  6. Complaint > North-South Corridor (Kvesheti-Kobi) Road Project

    Monitoring: CRP 1st Annual Monitoring Report (English)

    ...climate-resilient bypass road between Kvesheti and Kobi, and about 5 km of climate-resilient all-weather access roads to roadside towns and villages; (ii) the establishment of a Khada Valley visitors’ center; and (iii) capacity-building of the Roads Department of Georgia on project and contract management. The road construction, which includes 5 tunnels (with the 9-km tunnel being the longest in Georgia) and 5 bridges (one of which is an arched bridge), is a greenfield project that passes ...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2023
Previous | Next