Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

55 Results

Showing Only Eligibility (Show All Results)

Top Results By:

Show All

  1. Complaint > Irrigation System Enhancement Project (First Request)

    Eligibility: 106-Report and Recommendation(English)

    ...wind turbines be built at the reservoir, the 50-year-old pump stations be replaced with modern and energy-efficient pumps designed for current water levels, new reservoirs be built to store water flowing into the Azat River and five-year measurements of the Azat River be conducted, only after which the Project's usefulness should be discussed. D. Summary of the Management Response 4 22. The following section provides a summary of the Manage...

    WB Inspection Panel - Armenia - 2016
  2. Complaint > Transport Sector Support Project and its Additional Financing

    Eligibility: Inspection Panel Report and Recommendation

    ...winding route to crossing from one t the other. 8. The working conditions of workers has never been human. The toilets at the construction side were poorly done, got filled and during rainy season used to over flow. This was allegedly rectified when it came to their attention that there was a complain on the project . Those spoken to claim that milk is never given to them as required, no protective cover , poor working relationships. Wi...

    WB Inspection Panel - Kenya - 2018
  3. Complaint > Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing

    Eligibility: 102-Second Report and Recommendation(English)

    ...wind and solar sources could not fully substitute for hydro or coal based energy generation options. Management indicates that this study continues to be a reference point for the options assessment carried out thus far. 26. Coal fired plants and increased electricity imports were compared with the best potential options for the proposed Shuren HPP during the pre-feasibility study. The latter were identified through a separate analysis of alternative sites for hydropower development on...

    WB Inspection Panel - Mongolia - 2015
  4. Complaint > PT Weda Bay Nickel-01/Weda Bay

    Eligibility: Ombudsman Assessment Report: Complaint Regarding the MIGA PT Weda Bay Nickel Project (#8113), Halmahera Island, North Maluku, Indonesia, June 2011

    ...windrijarto, Consultant, and an interpreter. Additional support in Washington was provided by Julia Gallu, Specialist Ombudsman. The subsequent CAO visits conducted in January-April 2011 focused on confirming CAO's understanding of the issues and stakeholder concerns and assisting the parties in reaching an informed decision on a process for addressing the issues raised in the complaint. Particular care was taken by the CAO to spend sufficient time with the community members to ensure their...

    IFC Compliance Advisor/Ombudsman - Indonesia - 2011
  5. Complaint > Western Poverty Reduction Project

    Eligibility: 16-Management Report and Recommendation (English)

    ...winds and periodic flash floods, the impact of which is worsened by the widespread deforestation throughout the area. Crop yields are low due to poor soil quality and recurrent droughts. Many households do not produce adequate food grain for their own subsistence and have to borrow from relatives or better-off neighbors to supplement the limited welfare ration provided by local governments. Based on extensive research, it has been determined that the area offers little or no development opportun...

    WB Inspection Panel - China - 1999
  6. Complaint > Yanacocha-02/Cajamarca

    Eligibility: Independent Investigation into the Mercury Spill of June 2, 2000 in the Vicinity of San Juan, Choropampa and Magdalena, Peru - June 2000

    ...wind over severe mountain landscape. The roads network has benefited from investment of around $2bn since 1992, when Peru regained eligibility for loans from The road from Cajamarca to Lima in the multilateral organizations. The country’s two vicinity of km 155. main motorways, roads linking departmental and provincial capitals, rural roads and streets in Andean towns have all undergone extensive repair and resurfacing. Within Peru there is no comprehensive set of regu...

    IFC Compliance Advisor/Ombudsman - Peru
  7. Complaint > Yanacocha-03/Cajamarca

    Eligibility: Independent Investigation into the Mercury Spill of June 2, 2000 in the Vicinity of San Juan, Choropampa and Magdalena, Peru - June 2000

    ...wind over severe mountain landscape. The roads network has benefited from investment of around $2bn since 1992, when Peru regained eligibility for loans from The road from Cajamarca to Lima in the multilateral organizations. The country’s two vicinity of km 155. main motorways, roads linking departmental and provincial capitals, rural roads and streets in Andean towns have all undergone extensive repair and resurfacing. Within Peru there is no comprehensive set of regu...

    IFC Compliance Advisor/Ombudsman - Peru
  8. Complaint > Marlin-01/Sipacapa

    Eligibility: Annexes

    ...wind and downwind) fixed monitoring determine if any harmful harmful constituents are stations. Negotiations between company and contained in the dust, including arsenic and lead government on this matter are not final. in PM10. • Plans to mo...

    IFC Compliance Advisor/Ombudsman - Guatemala
  9. Complaint > Second Urban Environment Sanitation Project

    Eligibility: 49-Management Report and Recommendation (English)

    ...wind conditions, visual aspects, geology, with OP 4.01, which calls for actions to surface water, etc., and local and national regulations. prevent, avoid, mitigate, or compensate for such impacts. Action: If the new EA identifies a sanitary landfill as the Management has informed the Panel preferred alternative, it will evaluate impacts within the that the new EIA will examine these landfill’s ar...

    WB Inspection Panel - Ghana - 2007
  10. Complaint > Second Norte Grande Water Infrastructure Project

    Eligibility: 73-Eligibility Report (English)

    ...Winds DULCE Rv. LOS FLORES Neighborhood Exhibit 4- Photos of existing sewer discharges. CITY OF SANTIAGO DEL ESTERO (WEST bank of the DULCE River) Alsina Discharge ULLUAS Lagoon Atmospheric Trucks LA COSTA 2 Discharge (direct inspection by Prosecutor GOMEZ) SIGLO XXI Discharge LOS FLORES Discharge Double discharge at LA COSTA LA COSTA 1 Discharge New discharge under construction Exhibit 5 – False Addresses of Indigenou...

    WB Inspection Panel - Argentina - 2011
  11. Complaint > Greater Beirut Water Supply Project

    Eligibility: 71-Inspection Panel Final Report and Recommendation (English)

    ...Windsor Sung, Ph.D, PE Program Manager, Massachusetts Water Resources Authority Lecturer, Massachusetts Institute of Technology Memo To: Claire A. Kfouri From: Windsor Sung Date: November 26, 2012 Re: Greater Beirut Water Supply Project ± Independent Water Quality Review Summary Water quality data from Joun, Bisri (Awali river), Anane and Qaraoun (Karoun) Reservoirs were reviewed....

    WB Inspection Panel - Lebanon - 2010
  12. Complaint > Ecodevelopment Project

    Eligibility: 11-Eligibility Report (English)

    ...winds, State turned a blind eye to the exploitation of the Nagarahole Adivasi by the planters and tobacco growers even while legislating many forest laws, perpetrating state sponsored exploitation. STATE IMPOSED WELFARE MEASURES: Naturally, under the circumstances the priority of the State revolved around forceful eviction of the Adivasi from their habitat and “civilize” them through various welfare schemes such as providing modern education, giving them alien implements such as those whi...

    WB Inspection Panel - India - 1998
  13. Complaint > Water Supply Augmentation Project, Greater Beirut Water Supply Project and its Additional Financing

    Eligibility: Inspection Panel Report and Recommendation

    ...wind, drawdown zone vegetation, upper catchment inputs (especially from sewage and runoff), decay of inundated soil and biomass, growth and decay of aquatic plants, methane bubbles (due to lower hydrostatic pressure), plankton growth and decay, degassing ...

    WB Inspection Panel - Lebanon - 2018
  14. Complaint > Mumbai Urban Transport Project

    Eligibility: 32-Management Report and Recommendation (English)

    ...wind direction is towards the north, odor-related prob- lems are small. Action: The Bank will request that MMRDA undertake a specific study of the drainage line from the dump site to the waterway passing through Mankhurd to deter- mine if mitigation ...

    WB Inspection Panel - India - 2004
  15. Complaint > Itaparica Resettlement and Irrigation Project

    Eligibility: Inspection Panel Report and Recommendation

    ...wind speedsof 10 metersper second or more. Consequently,up to 50% of the area is notproperly concludeshis letter by exhortingthe WorldBank irrigated The coordinator to act in favor of the project: We wish to drawyour attention once again to this cynical disregard,so that the WorldBank can truly assumei...

    WB Inspection Panel - Brazil - 1997
Previous | Next