DocSearch | Accountability Console
Complaints IAMs Register Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

7 Results

Showing Only Registration (Show All Results)

Top Results By:

  1. Complaint > Vishnugad Pipalkoti Hydro Electric Project

    Registration: Notice of Registration (English)

    ...Vice President, South Asia Department, World Bank on the violation of Operational Policies in grant of loan to THDC India for Vishnugad-Pipalkoti Hydro Electric Project" which is signed by one of the Requesters and several other individuals, and has nine annexures. The Project The Vishnugad Pipalkoti Hydro Electric Project (VPHEP) is a proposed 444 Megawatt (MW) run-of-the-river hydro generation project on the Alaknanda River, ...

    WB Inspection Panel - India - 2012
  2. Complaint > Uttaranchal Decentralized Watershed Development Project

    Registration: 45-Notice of Registration (English)

    ...President of Sarvodaya), Dr. Anajali Thapiyal (Vice-Presidnet of Sarvodya), Ms. Ranjeeta Verma (Treasurer), Mr. Gaurav Thapiyal, and Ms. Poonam. 2 Letter dated March 9, 2007, pg.2. 3 Project Appraisal Document on a Proposed Credit in the Amount of SDR 47.40 Million (US$69.62 Million Equivalent) to India for a Uttaranchal Decentralized Watershed Development Project (UDWDP), dated April 14, 2004, hereinafter “PAD”, pg. 1. ...

    WB Inspection Panel - India - 2007
  3. Complaint > Quilleco Hydropower Project

    Registration: 67-Notice of Registration (English)

    ...President of the World Bank at the time, Mr. James Wolfensohn, and IFC’s Executive Vice President at the time, Mr. Jannik Lindbaek, appointed Dr. Jay Hair (then President of IUCN – the International Union for Conservation of Nature) to prepare another report; in July 1997 an edited version of the report was made public. The third is a report of CAO. In July 2002, downstream municipalities flooded by water releases from the Pangue dam’s reservoir during heavy rain, together with Pehuenche familie...

    WB Inspection Panel - Chile - 2010
  4. Complaint > Madhya Pradesh Water Sector Restructuring Project, 1st request

    Registration: 72-Memorandum to the Executive Directors (English)

    ...Vice President and her team have been proactive in trying to resolve the problems since the matter was brought to their attention by the Requesters and by the Inspection Panel. Both the Requesters and Senior Management have indicated to the Panel their interest in pursuing an early and efficient effort to remedy the situation. The Requesters have informed the Panel about meetings held with the Bank Team on site on October 31,2010, December 11,2010, and February 18,2011. Moreover, after the Dece...

    WB Inspection Panel - India - 2010
  5. Complaint > Sustainable Agriculture and Rural Development Project

    Registration: 95-Notice of Non-Registration(English)

    ...vices Contracting Dedicated Satisfactory levels of Main services include: 12/01/2014 Ongoing, on track. Consulting Services to services to ICs for the • Four capacity building events for IC members replace the NGO Service remainder of 2014 organized and undertaken, including payment Identification of firm: • Single sourced firm: Provider for six months and the beginning of ...

    WB Inspection Panel - Paraguay - 2014
  6. Complaint > Water Supply Augmentation Project, Greater Beirut Water Supply Project and its Additional Fiancing - Second Request

    Registration: Notice of Non-Registration

    ...president of ICOLD and currently serves as honorary president and member of ICOLD on Seismic Aspects of Dam Design. Another expert on the DSP is also a member of ICOLD and has extensive experience with earthquake engineering. The Panel notes that the members of the DSP are well-qualified experts who are familiar with ICOLD standards, including Bulletin 137 on Reservoirs and Seismicity: State of Knowledge. With regards to the Requesters’ allegation of a conflict of interest concerning one member ...

    WB Inspection Panel - Lebanon - 2019
  7. Complaint > Upper Egypt Local Development Program for Results

    Registration: Notice of Non-Registration (English)

    ...vice referred to above. ANNEX 2 Management Memorandum THE WORLD BANK/IFC/MIGA OFFICE MEMORANDUM DATE: February 13, 2019 TO: FROM: EXTENSION: m Imrana Jalal, Chairperson, IBRD/IDA Inspection Panel Laura Tuck, Vice-President, GGSVP 32823 SUBJECT: Upper Egypt Local Development Program for Results (Pl 57395) The Upper Egypt Local Development Program for Result...

    WB Inspection Panel - Egypt - 2019