Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

14 Results

Showing Only ADB Special Project Facilitator and Compliance Review Panel (Show All Results)

Top Results By:

  1. Complaint > Clean Energy and Network Efficiency Improvement Project

    Closing Report: Closure Report

    ...Wind Park Master Plans and Business Model for Wind Park; Part 2: Master Plan for wind power development in Mannar District. Colombo; RMA Energy Consultants in association with Mercados Energy Markets India Pvt Ltd. 2014c. TA-8167 SRI: Capacity Building for Clean Power Development. Part B: Preparation of Renewable Development and Wind Park Master Plans and Business Model for Wind Park; Part 3: Commercial Arrangements and
Bidding Documents for Wind Development in Mannar District, Final Report. ...

    ADB Special Project Facilitator and Compliance Review Panel - Sri Lanka - 2021
  2. Complaint > Mundra Ultra Mega Power Project

    Management Action Plan: Remedial Actions (English)

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action11 Scheduled Dat...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2015
  3. Complaint > Rawalpindi Environmental Improvement Project (Sewage Treatment Plant Component)

    Filing: Complaint

    ...wind 6 direction. In case of Jabbar Miana land is being acquired at a distance of less than 300m from the houses both on north and west of the village??? And there is no mention of wind direction considerations in the SEIA. 7. ADB policy on Involuntary Resettlement provides for compensation to AP’s, at least equal to the "without" project situation. In ou...

    ADB Special Project Facilitator and Compliance Review Panel - Pakistan - 2009
  4. Complaint > Mundra Ultra Mega Power Project

    Monitoring: CRP 1st Annual Monitoring Report (English)

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action1 ...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2016
  5. Complaint > Mundra Ultra Mega Power Project

    Monitoring: CRP 2nd Annual Monitoring Report (English)

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action1 Schedule...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2017
  6. Complaint > Mundra Ultra Mega Power Project

    Monitoring: CRP 3nd Annual Monitoring Report (English)

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action 1 Schedule...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2018
  7. Complaint > Nenskra Hydropower Project

    Filing: Request for Compliance Review

    ...wind will intensify evaporation. Evaporated moisture will cover buildings and fruit trees in a form of hoar frost and damage them. The damage caused by early frosts is graver as it will damage buds and sprouts, and ultimately result in premature aging, fruitlessness and dying of plants. For the people, that experience from rheumatism and/or need treatment respiratory or cardiovascular diseases the health condition will further aggravate.” • As a result of the construc...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2017
  8. Complaint > Clean Energy and Network Efficiency Improvement Project

    Dispute Resolution: Final Report (English)

    ...wind and solar power generation. Affected households and impact: The project involved the construction of new substations, upgrading and augmentation of existing substations, construction of transmission lines, construction of distribution gantries and its associated lines, and rooftop solar power generation investments in Sri Lanka. Land acquisition was required only for the construction of the new transmission grid substations and distribution gantries. Approximately 7.70 hectares (ha) o...

    ADB Special Project Facilitator and Compliance Review Panel - Sri Lanka - 2023
  9. Complaint > Visayas Base-Load Power Project

    Monitoring: 3rd Annual Monitoring Report

    ...wind direction and power production and this data is verified as accurate and again made transparent by sharing the same with all stakeholders including the complainants, communities, and KSPC as well as other industrial establishments concerned such as APO Cement; (iii) the air quality monitoring data is then used to verify the air modeling that is done and the model is appropriately adjusted and this data and modeling is also made transparent and feedback obtained from all stakeholders....

    ADB Special Project Facilitator and Compliance Review Panel - Philippines - 2015
  10. Complaint > Mundra Ultra Mega Power Project

    Filing: Request for compliance review

    ...wind blows from the conveyor side to their side (which is quite often). There are layers of coal dust covering their floors, their bodies when they sleep outside on the terrace (something which is normal in summer). Villagers from Tunda‐Vandh also reported breathing difficulties, whenever the coal conveyor runs “at speed”. 2. Children’s Health at Risk There is a roughly 20% increase in children’s respiratory diseases in the past two years, since the CGPL is functioning. It is a ...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2013
  11. Complaint > Mundra Ultra Mega Power Project

    Compliance Report: Final Report (English)

    ...winds. According to CGPL, coal dust pollution is strong during the three winter months when wind blows from the coal stock piles towards the village. Residents of the Wand and Tunda villages confirmed this, but also indicated that they were regularly cleaning to remove the dust deposits. They complained about strong coal dust pollution all year round. The pollution is much stronger at Wand village, where some houses are located less than 300 m away from the CGPL coal storage area and convey...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2015
  12. Complaint > Visayas Base-Load Power Project

    Monitoring: 1st Annual Monitoring Report

    ...winds had scattered the coal dust over the surrounding area. The incident prompted the Naga City mayor, on 13 November 2012, to issue a cease-and-desist order, which was lifted on 15 November 2012 after KSPC proposed a short- and long-term plan including the roofing of the coal yard. (See Figure 3.) This occurrence should have been anticipated in the design of the facility, but the CRP is pleased that KSPC has taken the appropriate action. Figure 3: KSPC Coal Yard, Covered Since the Novembe...

    ADB Special Project Facilitator and Compliance Review Panel - Philippines - 2013
  13. Complaint > Sustainable Urban Transport Investment Program - Tranche 3

    Compliance Report: CRP's Final Report (English)

    ...wind systems. The city has a preload significantly above the WHO interim targets. Table 2 points to the high preload value for all SO2, NO2, and PM10. 15 WBG EHS Guidelines – Air Emissions and Ambient Air Quality Guideline, p. 4 (30 April 2007) at http://www.ifc.org/wps/wcm/connect/532ff4804886583ab4d6f66a6515bb18/1- 1%2BAir%2BEmissions%2Band%2BAmbient%2BAir%2BQuality.pdf?MOD=AJPERES 16 See IEE page 111-113, where reference is made to “Georgian Permissive Threshold Concentrat...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2017
  14. Complaint > North-South Corridor (Kvesheti-Kobi) Road Project

    Compliance Report: CRP's Final Report (English)

    ...winds. The situation in Kvesheti and Arakhveti areas and in Kobi is different since these settlements are located along the existing main road where exhaust emissions occur from passing vehicles. 83. The EIA records that air quality measurements were taken in Kvesheti, Arakhveti and Kobi to get a better understanding of air quality in the project area.22 However, measurements were not taken in Tskere and at other locations in the Khada Valley. The CRP therefore observed at eligibility stag...