120 MW Malicounda Dual Fuel Power Project in Senegal | Accountability Console
Complaints IAMs Register Login

Loading...

120 MW Malicounda Dual Fuel Power Project in Senegal

Sectors

Energy

Description:

Projects in this Sector: 241

Browse Projects

Issues Raised

Community health and safety

Description:

Projects with this Issue Raised: 363

Browse Projects

Consultation and disclosure

Description:

Projects with this Issue Raised: 538

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 494

Browse Projects

Due diligence

Description:

Projects with this Issue Raised: 486

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 345

Browse Projects

Procurement

Description:

Projects with this Issue Raised: 79

Browse Projects

Project Information

Investment ID:

Bank: African Development Bank

Environmental Category: N/A

Country: Senegal

Region: Sub-Saharan Africa

Approval Date: Nov. 27, 2018

Investment Types: Loans

Total Project Cost: USD 55.4 million

Total Complaints: 1

Description

The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km from Dakar, Senegal. It consists of a greenfield power plant with a PPA guaranteed to be developed under a 20-year Build-Own-Operate-Transfer (BOOT) scheme with Senelec, the state-owned utility. The plant will utilize heavy-fuel oil (HFO) as primary source of energy, and will be converted to natural gas as soon as it is available in the country. The plant will be connected to the grid through the existing 225kV substation adjacent to the site. The project will also contribute to the improvement of electricity access to the surrounding communities and villages through the medium voltage transmission line to be connected to the substation.

Investments

Investment Type ID Amount Status Bank Client
Loans Unknown USD 55.4 million Approved AfDB Senelec

Related Complaints

African Development Bank IRM Complaints IAM Country Date Filed Status
120 MW Malicounda Dual Fuel Power Project in Senegal AfDB IRM Senegal 17/12/2021 Active

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Senelec