Adjaristsqali Georgia LLC | Accountability Console
Complaints IAMs Register Login

Loading...

Adjaristsqali Georgia LLC

Sectors

Energy

Description:

Projects in this Sector: 162

Browse Projects

Issues Raised

Biodiversity

Description:

Projects with this Issue Raised: 104

Browse Projects

Community health and safety

Description:

Projects with this Issue Raised: 260

Browse Projects

Due diligence

Description:

Projects with this Issue Raised: 387

Browse Projects

Environmental

Description:

Projects with this Issue Raised: 272

Browse Projects

Project Information

Investment ID: 33435, 37781, 601449, 12315

Bank: IFC/MIGA , IFC/MIGA

Environmental Category: A

Country: Georgia

Region: Europe and Central Asia

Approval Date: None

Investment Types: LoansEquityAdvisory servicesRisk Guarantee

Total Project Cost: No recorded data on this

Total Complaints: 1

Description

The Adjaristsqali Georgia LLC (AGL) project involves the construction of a cascade of hydroelectric power plants in the Adjaristsqali region, Adjara, Georgia. The cascade was originally proposed to include three phases, namely the 185 megawatt (MW) Shuakhevi scheme, the 150MW Koromkheti scheme, and the 65MW Khertvisi scheme. The Khertvisi scheme was not pursued by AGL due to significant economic and environmental risks and Koromkheti is in early stages of development under a separate InfraVentures project. Therefore only Shuakhevi is considered ‰'the Project and is being developed by Adjaristsqali Georgia LLC (AGL) as a joint venture between Indias Tata Power, Norways Clean Energy Invest (40 percent each) and IFC (20 percent).

Related Complaints

IFC/MIGA CAO Complaints IAM Country Date Filed Status
AGL-01/Makhalakidzeebi IFC CAO Georgia 15/02/2018 Active

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Adjaristsqali Georgia LLC