Contact Us
×Thank you for taking the time to help us improve the Console.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Loading...
Alto Maipo Hydroelectric Power Project
Sectors
Issues Raised
Project Information
Investment ID: CH-L1067, CH-L1067
Bank: Inter-American Development Bank
Environmental Category: Unkno
Country: Chile
Region: Latin America and the Caribbean
Approval Date: Oct. 16, 2013
Investment Types: Loans
Total Project Cost: USD 2.1 billion
Total Complaints: 3
Description
The objective of the Project is to provide long term project financing for the design, construction, operation and maintenance of two run-of-the-river hydroelectric plants (in hydraulic series) for a total of 531MW, to be located in the Maipo River Basin (MRB), 50 km southeast of Santiago
Investments
Investment Type | ID | Amount | Status | Bank | Client |
---|---|---|---|---|---|
Loans | CH-L1067 | USD 270.0 million | Planned | IDB | AES Gener S.A, Antofagasta Minerals S.A. |
Loans | CH-L1067 | USD 125.0 million | Planned | IDB | Alto Maipo SpA |
Related Complaints
Inter-American Development Bank MICI Complaints | IAM | Country | Date Filed | Status |
---|---|---|---|---|
Alto Maipo Hydroelectric Power Project | IDB MICI | Chile | 23/01/2017 | Closed With Outputs |
Alto Maipo Hydroelectric Power Project - Request II | IDB MICI | Chile | 05/07/2017 | Closed Without Outputs |
Alto Maipo Hydroelectric Power Project - Request III | IDB MICI | Chile | 29/01/2019 | Closed Without Outputs |
Implementers
Name | Complaints | Dispute Resolutions | DR Successful | Compliance Reviews | Non-Compliance |
---|---|---|---|---|---|
AES Gener S.A, Antofagasta Minerals S.A. |