Alto Maipo Hydroelectric Power Project | Accountability Console
Complaints IAMs Register Login

Loading...

Alto Maipo Hydroelectric Power Project

Sectors

Energy

Description:

Projects in this Sector: 241

Browse Projects

Infrastructure

Description:

Projects in this Sector: 592

Browse Projects

Issues Raised

Biodiversity

Description:

Projects with this Issue Raised: 134

Browse Projects

Consultation and disclosure

Description:

Projects with this Issue Raised: 538

Browse Projects

Cultural heritage

Description:

Projects with this Issue Raised: 120

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 494

Browse Projects

Due diligence

Description:

Projects with this Issue Raised: 486

Browse Projects

Environmental

Description:

Projects with this Issue Raised: 408

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 345

Browse Projects

Unknown

Description:

Projects with this Issue Raised: 727

Browse Projects

Water

Description:

Projects with this Issue Raised: 195

Browse Projects

Project Information

Investment ID: CH-L1067, CH-L1067

Bank: Inter-American Development Bank

Environmental Category: Unkno

Country: Chile

Region: Latin America and the Caribbean

Approval Date: Oct. 16, 2013

Investment Types: Loans

Total Project Cost: USD 2.1 billion

Total Complaints: 3

Description

The objective of the Project is to provide long term project financing for the design, construction, operation and maintenance of two run-of-the-river hydroelectric plants (in hydraulic series) for a total of 531MW, to be located in the Maipo River Basin (MRB), 50 km southeast of Santiago

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
AES Gener S.A, Antofagasta Minerals S.A.