Alto Maipo Hydroelectric Power Project | Accountability Console
Complaints IAMs Register Login

Loading...

Alto Maipo Hydroelectric Power Project

Sectors

Energy

Description:

Projects in this Sector: 162

Browse Projects

Infrastructure

Description:

Projects in this Sector: 362

Browse Projects

Issues Raised

Biodiversity

Description:

Projects with this Issue Raised: 104

Browse Projects

Consultation and disclosure

Description:

Projects with this Issue Raised: 388

Browse Projects

Cultural heritage

Description:

Projects with this Issue Raised: 82

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 331

Browse Projects

Due diligence

Description:

Projects with this Issue Raised: 390

Browse Projects

Environmental

Description:

Projects with this Issue Raised: 275

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 243

Browse Projects

Other

Description:

Projects with this Issue Raised: 466

Browse Projects

Water

Description:

Projects with this Issue Raised: 165

Browse Projects

Project Information

Investment ID: CH-L1067, CH-L1067

Bank: Inter-American Development Bank , Inter-American Development Bank

Environmental Category: Unkno

Country: Chile

Region: Latin America and the Caribbean

Approval Date: Oct. 16, 2013

Investment Types: LoansLoans

Total Project Cost: USD 2.1 billion

Total Complaints: 3

Description

The objective of the Project is to provide long term project financing for the design, construction, operation and maintenance of two run-of-the-river hydroelectric plants (in hydraulic series) for a total of 531MW, to be located in the Maipo River Basin (MRB), 50 km southeast of Santiago

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
AES Gener S.A, Antofagasta Minerals S.A.