Nachtigal Hydropower Project | Accountability Console
Complaints IAMs Register Login

Loading...

Nachtigal Hydropower Project

Sectors

Energy

Description:

Projects in this Sector: 241

Browse Projects

Issues Raised

Community health and safety

Description:

Projects with this Issue Raised: 363

Browse Projects

Consultation and disclosure

Description:

Projects with this Issue Raised: 537

Browse Projects

Cultural heritage

Description:

Projects with this Issue Raised: 120

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 494

Browse Projects

Environmental

Description:

Projects with this Issue Raised: 408

Browse Projects

Gender-related

Description:

Projects with this Issue Raised: 22

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 345

Browse Projects

Water

Description:

Projects with this Issue Raised: 194

Browse Projects

Project Information

Investment ID:

Bank: African Development Bank

Environmental Category: N/A

Country: Cameroon

Region: Sub-Saharan Africa

Approval Date: None

Investment Types: Loans

Total Project Cost: UAC 786.5 million

Total Complaints: 1

Description

The present intervention concerns the Nachtigal Hydro Power Project. It’s a hydroelectric plant of 420 MW, jointly designed by the Republic of Cameroon, EDF International (Electricity of France) and the IFC. The project is to be built on the Sanaga River, 65 km northeast of Yaoundé, which has Cameroon's largest hydropower potential. The plant should be connected to the Southern Interconnected Grid (RIS), which accounts for 94% of Cameroon's electricity consumption. The project also includes the construction of a 225 kV substation and a 50 km transmission line to the Nyom 2 connection station. Nachtigal will be the third project to benefit from the hydroelectric potential of the Sanaga River, after EDEA (276 MW commissioned in the 1950s) and Song Loulou (384 MW in the late 1970s). The project site has good all-season road access, which will facilitate the transportation of equipment during the construction phase. The hydroelectric facilities and the production substation are located in the same perimeter, while the transmission line is located in another perimeter.

Investments

Investment Type ID Amount Status Bank Client
Loans Unknown UAC 102.2 million Closed AfDB Nachitgal hydroelectric company (NHPC)

Related Complaints

African Development Bank IRM Complaints IAM Country Date Filed Status
Nachtigal Hydropower Project AfDB IRM Cameroon 21/06/2022 Active

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Nachitgal hydroelectric company (NHPC)