Photovoltaic Solar Power Projects in Egypt, under the Feed-in-Tariff (Fit) Program in Egypt
Sectors
Issues Raised
Project Information
Bank: African Development Bank
Environmental Category: 2
Country: Egypt
Region: Middle East and North Africa
Approval Date: None
Investment Types: Loans
Total Project Cost: USD 72.0 million
Total Complaints: 1
Description
This intervention focuses on the second phase of the Alcazar Solar Project. This project involves the design, construction, operation and maintenance of a photovoltaic (PV) solar power plant with a nominal capacity of 50 MW in Benban area, 50 km north of Aswan City in Upper Egypt. It's one of Alcazarâs two projects under the FiT program. The Project will be constructed in Benban, 40km north of Aswan (Egypt), where the direct solar radiation is 2,280 kWh/m2. The Egyptian Electricity Transmission Company (âEETCâ) will construct the required substations and transmission lines with an interconnection cost of EGP 0.95m per MW. The Project Alcazar I is part of a larger Feed-in-Tariff (FiT) program initiated by the Government of Egypt in 2014 in order to reach the target of 20% renewable energy in the generation mix by 2020. The FiT program will add 4,300 MW to the countryâs generation capacity from renewable sources. Otherwise, the polycrystalline technology based solar PV modules and single axis tracker system will be used for the power plant. The solar tracker will allow PV panels to track the movement of the sun to ensure maximum power output.
Investments
Investment Type | ID | Amount | Status | Bank | Client |
---|---|---|---|---|---|
Loans | Unknown | USD 18.0 million | Active | AfDB | Goverment of Egypt |
Related Complaints
African Development Bank IRM Complaints | IAM | Country | Date Filed | Status |
---|---|---|---|---|
Photovoltaic Solar Power Projects in Egypt, under the Feed-in-Tariff (Fit) Program in Egypt | AfDB IRM | Egypt | 12/09/2022 | Closed Without Outputs |
Implementers
Name | Complaints | Dispute Resolutions | DR Successful | Compliance Reviews | Non-Compliance |
---|---|---|---|---|---|
The Egyptian Electricity Transmission Company |