Tanahu Hydropower Project | Accountability Console
Complaints IAMs Register Login

Loading...

Tanahu Hydropower Project

Sectors

Energy

Description:

Projects in this Sector: 241

Browse Projects

Infrastructure

Description:

Projects in this Sector: 592

Browse Projects

Issues Raised

Consultation and disclosure

Description:

Projects with this Issue Raised: 538

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 494

Browse Projects

Indigenous peoples

Description:

Projects with this Issue Raised: 89

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 345

Browse Projects

Other

Description:

Projects with this Issue Raised: 219

Browse Projects

Project Information

Investment ID: 2990-NEP, 8329-NEP, 2991-NEP

Bank: Asian Development Bank

Environmental Category: A

Country: Nepal

Region: South Asia

Approval Date: Feb. 21, 2013

Investment Types: Advisory services, Loans

Total Project Cost: USD 191.0 million

Total Complaints: 2

Description

The project has three main components: (i) a medium-sized hydropower plant of 140 megawatts (MW) with significant water storage facilities and associated transmission lines to evacuate the generated power; (ii) rural electrification and community development in the project area, and (iii) a reform and restructuring plan for the national utility, the Nepal Electricity Authority (NEA). The project site is in the Seti River in the Tanahu district, about 150 kilometers (km) west of Kathmandu.

Implementers