Project Information
Investment ID: Loan 2924-IND
Bank: Asian Development Bank
Environmental Category: B
Country: India
Region: South Asia
Approval Date: Oct. 26, 2012
Investment Types: Loans
Total Project Cost: USD 214.3 million
Total Complaints: 1
Description
The project will expand the transmission evacuation system in Uttarakhand resulting in rapid expansion of hydropower. Approximately 6,000MW of hydropower capacity is expected to be developed in Uttarakhand by 2021, of which 2,700MW will be added in Alaknanda river basin. The project will establish a strong and reliable bulk power evacuation system of 2,500MW capacity connecting Uttarakhand to the Northern Grid. The proposed tranche will have the following outputs: (i) construction of 400/220kV 2 x 315MW GIS substation in Pipalkoti; and (ii) construction of 400kV double circuit (D/C) from Srinagar to Kashipur Transmission Line (152.8km).
Investments
Related Complaints
Implementers