Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

369 Results

Top Results By:

Show All

  1. Complaint > Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project

    Project Document: Chad-Cameroon Petroleum Development and Pipeline Project Program Performance and Assessment Report

    ...changes in the EMP-proposed by IFC and supported by the ECMG-related to the in-fill drilling program and the dramatic increase in the project’s footprint in Chad. The client believes that it i s legally bound to the required actions detailed in the EMP and new issues that have emerged can be addressed by changes in the implementation procedures (internal execution procedures) without the need to change the EMP principles which have been defined at the beginning o f the project. W h i l e th...

    WB Inspection Panel - Chad - 2009
  2. Complaint > Paraguay/Argentina Reform Project for the Water and Telecommunication Sectors, SEGBA V Power Distribution Project (Yacyreta)

    Management Action Plan: 26-Third Management Progress Report-20 December 2006

    ...changes to the local authorities in order to allow more flexible resettlement planning and to accommodate some resettlers closer to the city center. 16. Third, EBY’s revised PARR called for publishing a l i s t o f all persons/families entitled to housing, with a period o f 30 days to make additional claims. That is, families not included o n the l i s t could f i l e for entitlement within the 30-day period. The Bank observed that this would be a reasonable approach which, if handled properly,...

    WB Inspection Panel - Argentina, Paraguay - 2002
  3. Complaint > DIF Lydian (Amulsar Gold Mine) 2

    Eligibility: Eligibility Assessment Report

    ...changes in the micro-climate to support populations of P. porphyrantha adjacent to the mine. The brown bear Ursus arctos is a protected species in Armenia and is included in the national Red Data Book with a status of Vulnerable (Margarian 1987). Ecological surveys carried out as part of the Environmental and Social Impact Assessment (ESIA) for Amulsar has confirmed that a breeding population is present. In spring 2014 two ...

    EBRD Project Complaint Mechanism - Armenia
  4. Complaint > Petroleum Development and Pipeline Project, and Petroleum Environment Capacity Enhancement Project

    Management Response: 27-Management Response (English)

    ...change in the EMP itself, the Change Management Process described in the EMP will be put into effect. Insufficient Analysis of Alternatives – Management believes that the analysis of alternatives was carried out correctly, and that the Pipeline Project, in combination with the CAPECE Project, will bring net benefits to Cameroon. Cumulative Impacts - Management takes the position that the EA/EMP took into account the cumulative impacts a...

    WB Inspection Panel - Cameroon - 2002
  5. Complaint > Paraguay/Argentina Reform Project for the Water and Telecommunication Sectors, SEGBA V Power Distribution Project (Yacyreta)

    Management Response: 26-Management Response (English)

    ...changes or deterioration and allowing public scrutiny of • No significant changes in chemical and its operation and related impacts. physical parameters in reservoir • Continue to closely monitor • In fact, filling the reservoir by stages has EBY-IDB bidding process for allowed flushing effect and washing away ...

    WB Inspection Panel - Argentina, Paraguay - 2002
  6. Complaint > Transport Sector Development Project - Additional Financing

    Other: GBV Task Force Recommendations

    ...change in recent years in terms of organizational structure and of fundamental policies and processes, including ongoing implementation of the new Procure- ment Framework and the roll out of the new ESF. Repeated organizational change can contribute to general fatigue toward new initiatives. Together these present obstacles to building an effective response. These barriers to change are compounded by the sensitive nature of the issue. The Bank’s social development staff are motivated by th...

    WB Inspection Panel - Uganda - 2015
  7. Complaint > Private Sector Development and Competitiveness Project (First Request)

    Management Response: 54-Deuxième Réponse de la Direction et Rapport d’avancement (Français)

    ...changes entre la Banque mon- consultations suspendues à la paroisse de Fatima à Kinshasa. diale et les syndicats représentant les anciens sala- riés des banques en liquidation entre 2003 et 2007. 26 septembre 2003 : Un courrier électronique de [le Consultant] infor- Au travers de ces échanges, la Direction s’est effor- mant les représentants des anciens salariés de la non-objection de la ...

    WB Inspection Panel - Democratic Republic of Congo - 2009
  8. Complaint > Transitional Support for Economic Recovery Credit and Emergency Economic and Social Reunification Support Project

    Eligibility: 37- Management Report and Recommendations (English)

    ...changes to the legal structure of forestry in the Congo, the new developments concerning the zonation and potentially the impacts that they will have on the rights, land rights regime in Congo, will affect potentially tens of millions of people. As yet almost none of those people are aware of the major changes that may well be coming their way. And so we fear that this is potentially creating a dangerous situation that may fuel conflict in coming years, as indeed similar kinds of changes have fu...

    WB Inspection Panel - Democratic Republic of Congo - 2005
  9. Complaint > North-South Corridor (Kvesheti-Kobi) Road Project

    Monitoring: CRP 1st Annual Monitoring Report (English)

    ...climate-resilient bypass road between Kvesheti and Kobi, and about 5 km of climate-resilient all-weather access roads to roadside towns and villages; (ii) the establishment of a Khada Valley visitors’ center; and (iii) capacity-building of the Roads Department of Georgia on project and contract management. The road construction, which includes 5 tunnels (with the 9-km tunnel being the longest in Georgia) and 5 bridges (one of which is an arched bridge), is a greenfield project that passes ...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2023
  10. Complaint > Petroleum Development and Pipeline Project, and Petroleum Environment Capacity Enhancement Project

    Compliance Report: 27-Investigation Report (English)

    ...Change Management Process employed by COTCO relating to changes to the pipeline routing during construction. (See Box 3 below). Box 3: Alignment Sheets – Change Management Process • The Proposed routing change should stay within the area/terrain displayed in the alignment sheet. • The proposed change will respect the environmental and social parameters referenced in the alignment sheet (in other words, no adverse change in...

    WB Inspection Panel - Cameroon - 2002
  11. Complaint > Cartagena Water Supply, Sewerage and Environmental Management Project

    Management Response: 31-Management Response (English)

    ...changes in selected variables (project invest- the actual cost of the outfall sys- tem is likely to be much higher ment costs, as well as property tax collection rate improvements, ad- due to the environmental and ministrative costs, and exchange rate devaluation) on the main finan- other uncertainties mentioned cial indicators of the District (financial shortfall/surplus during project ...

    WB Inspection Panel - Colombia - 2004
  12. Complaint > Haiti Mining Dialogue Technical Assistance

    Filing: 100-Request for Inspection (French)

    ...Climate Change Resilience? (La Sécheresse Actuelle en Haïti: une Opportunité pour Construire la Résilience au Changement Climatique?) (22 avril 2014), Oxfam America, disponible à http://politicsofpoverty.oxfamamerica.org/2014/04/haiti-drought-opportunity-build-climate-change- resilience/. 107 Voir, par exemple, Evens Sanon et Trenton Daniel, Official: Haiti Drought Causes ‘Extreme’ Emergency Officiel: la Sécheresse en Haït Provoque une 'Extreme' Urgence, Associated Press (18 mars 2014), disp...

    WB Inspection Panel - Haiti - 2015
  13. Complaint > Natural Resource Management Project

    Management Response: 84-Management Response (English)

    ...changes: (i) a revision and simplification of the PDO (“to improve the management of water and forest resources in selected districts”); 2 (ii) a revision of the results framework, including changes to outcome indicators; (iii) a reallocation of about 21 percent of credit proceeds; (iv) an increase in the disbursement percentages by category, in line with the new Bank rules that allow up to 100 percent Bank financing for Project activities; and (v) the elimination of two outdated covenants....

    WB Inspection Panel - Kenya - 2013
  14. Complaint > South-West Corridor Road Project

    Dispute Resolution: Problem-solving Completion Report (English)

    ...change sessions involving the authorities, and the site visits to the road, which allowed the authorities and concerned residents to view the problems first-hand. The PSI also featured a road safety capacity-building workshop, which drew attention to road safety risks and introduced important prevention techniques. More specifically, • The dialogue provided an occasion for the parties to sit together and exchange views on issues of mutual concern, in a positive environment, witho...

    EBRD Project Complaint Mechanism - Kazakhstan
  15. Complaint > Second Urban Environment Sanitation Project

    Eligibility: 49-Management Report and Recommendation (English)

    ...change on aid disbursement from project- specific aid to direct budgetary support to the government. 22. Preparation of 2003 Environmental and Social Assessment (ESA). In preparing for the appraisal of UESP II in mid-2003, the Project team had the advantage of the relatively recent EIA described above. This EIA, on the basis of the 1999-2000 review of current conditions at the five alternative sites, had confirmed that Kwabenya remained the superior site among the five with respect to the o...

    WB Inspection Panel - Ghana - 2007
  16. Complaint > Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project

    Compliance Report: 22-Investigation Report (English)

    ...change management process. That means there are things which are important which come up, things which we did not expect, or things which are brought up by local people, and with things which are really essential to change, there is an opportunity to change. It is not a static process.” 36 OD 4.01 Institutional Aspects, Environmental Advisory Panels at § 13. 37 Project Files, May 26th 1998. 38 Environmental Management Plan for the Chad Export Project, May 1...

    WB Inspection Panel - Chad - 2001
  17. Complaint > Private Sector Development and Competitiveness Project (First Request)

    Management Response: 54-Management Response (English)

    ...change rate used for the calculation was a rate which was more favorable than that used by Gécamines in payroll, but less favorable than the exchange rate prevailing at the time of payment (payment took place several months after calculation, while Congolese franc depreciated against the dollar). At the time of the VDP Gécamines salary scales were in US dollars (as decided by Gécamines man- agement) but salaries were paid in Congolese francs, using a virtual exchang...

    WB Inspection Panel - Democratic Republic of Congo - 2009
  18. Complaint > MHP Corporate Support Loan, MHP Biogas

    Filing: Complaint (English)

    ...climate change, human rights and gender.” In line with the EC’s approach and the Court’s rulings regarding the implementation of the EIA Directive, Performance Requirement 1 #9 goes on to instruct that environmental and social assessment should identify associated facilities that are essential to the viability of the project, as well as cumulative impacts “of the project in combination with impacts from other relevant past, present and reasonably foreseeable developments as well as unp...

    EBRD Independent Project Accountability Mechanism - Ukraine
  19. Complaint > Forest Concession Management and Control Pilot Project

    Management Response: 36-Management Response (English)

    ...changes and tabular estimates of changes by major forest type for each con- cession and each park and protected area in Cambodia. These were based on satellite im- agery backed by ground truthing and the study (DFW, 2003e) has now become a standard reference for forest cover in Cambodia (see Annex 1, Item 30). Reference to the Forest Cover Survey was made in the course of political events and speeches during the 2003 national parliamentary election campaign, and complaints were registered with t...

    WB Inspection Panel - Cambodia - 2005
  20. Complaint > Productive Infrastructure Program - Request II: Caracol Industrial Park (MICI)

    Appraisal: Assessment Report Public Disclosure

    ...Climate Change and Sustainable Development Sector, is financing the Program through a series of grants and technical cooperation operations. Executing Agency The UTE is the Executing Agency of the Program. Since 2014, the operation of the PIC is the responsibility of SONAPI. However, given that the concerns of the Requesters ...

    IDB Independent Consultation and Investigation Mechanism - Haiti - 2017