DocSearch | Accountability Console
Complaints IAMs Register Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

170 Results

Top Results By:

Show All

  1. Complaint > Forest Concession Management and Control Pilot Project

    Compliance Report: 36-Investigation Report (English)

    ...unknown, the dominance of this historic Khmer kingdom within and beyond the current boundaries of Cambodia has very probably entailed many centuries of significant linguistic and ethnic “Khmerization” (or convergence of other languages and ethnic traditions toward those of the Khmer who were historically dominant in the region). 75. The map below shows localities where five language families are spoken ...

    WB Inspection Panel - Cambodia - 2005
  2. Complaint > Rehabilitation of the Railway in Cambodia Project 2

    Compliance Report: CRP’s Final Report in English, in Khmer [PDF] (Management's Response and Requester's Response to the CRP's Draft Report are attached)

    ...unknown proportion of these AHs were inadequately compensated for their houses. 164. ADB staff stated that houses were likely undercompensated for a variety of reasons, including (i) miscategorization where a house is assigned a class with lower compensation when it falls into more than one class, (ii) houses affected by the 25% rule unilaterally introduced by IRC contrary to the agreed 30 m2 rule, (iii) miscategorization of houses with two or more floors as single floored, and (iv) the applicat...

    ADB Special Project Facilitator and Compliance Review Panel - Cambodia - 2014
  3. Complaint > Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project

    Eligibility: 22-Management Report and Recommendation (English)

    ...unknown), examine alternative development scenarios and of OD 4.01. recommend appropriate land use and development patterns, as well as incorporate environmental concerns. Since the impetus for regional development was a single private sector investment, by an investor with n...

    WB Inspection Panel - Chad - 2001
  4. Complaint > Lake Victoria Environmental Management Project

    Compliance Report: 19-Investigation Report (English)

    ...unknown. These discoveries along the hyacinth free rocky shores indicated that it was unlikely that the hyacinth was playing any significant role in the survival of cichlid fish species."39 151. A crucial question concerns the fate of the water hyacinth seeds during and after shredding and sinking. The Management Response indicates that this was one of the issues raised with the experts consulted.40 The opinion was that: "Regeneration of water hyacinth af...

    WB Inspection Panel - Kenya - 1999
  5. Complaint > Petroleum Development and Pipeline Project, and Petroleum Environment Capacity Enhancement Project

    Management Response: 27-Management Response (English)

    ...unknown mechanism in Cameroon and that the learning and adjustment process needed to be completed before FEDEC could become the effective tool it is meant to be. FEDEC now has a place in the institutional landscape for environmental management in Cameroon and further actions are being taken and/or prepared to strengthen its activities. 29. An international consultant will be contracted by end November 2002 to start a comprehensive training program for all staff of CPSP and sectoral ministrie...

    WB Inspection Panel - Cameroon - 2002
  6. Complaint > Third Power Project, Fourth Power Project, and proposed Bujagali Hydropower Project

    Management Response: 24-Management Response (English)

    ...unknown. Hence no prior EIAs were done for the Old Owen Falls Dam. This is further compounded by the fact that to date no post-construction EIA has been done for the old Owen Falls Dam.” RESPONSE: 53. IDA conducted environmental and social analyses of Owen Falls Extension in 1990, consistent with the intent of OMS 2.36 on Environmental Aspects of Bank Work, May 1984. OD 4.00 (1989) was not applicable because the Power III Project was initiated in 1988. IDA subsequently conducted ...

    WB Inspection Panel - Uganda - 2001
  7. Complaint > Second Rural Enterprise Support Project

    Management Response: 89-Management Response and Addendum (English)

    ...unknown. In addition at the project level. Management recognizes the need to to Navruz, there were several tragic deaths. expand RESP II’s labor provisions to include adequate Igor Yachkevskiy, a 55-year old resident of measures against forced labor and will also incorporate this Tashkent city, died of a heart attac...

    WB Inspection Panel - Uzbekistan - 2013
  8. Complaint > Proposed Kosovo Power Project and Second Additional Financing Energy Sector Clean-up and Land Reclamation Project

    Management Response: 103-Management Response

    ...unknown capacity (refer page 39) 17. ISSUE: 2004 Emergency Displacement is a legacy issue for the The resettlement for the 2004 emergency displacement KPP that must be addressed. was carried out by UNMIK and PISG and was not part of any Bank-supported project. CLAIM: Livelihoods of 158 families (664 people) affected by 2004 Emergency Displacem...

    WB Inspection Panel - Kosovo - 2015
  9. Complaint > Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing

    Management Response: 102 - Management Response (English)

    ...unknown guard the consultation meeting. The Bank team promptly requested the whether and how stakeholder Policies, PMU to remedy this. The PMU was very responsive and agreed to comments were taken into includ- extend the closing date to receive comments from November 28 to consideration in further devel- ing but December 5, 2014. opment of those ToR. not lim- ited to Management notes that the revised ToR for t...

    WB Inspection Panel - Mongolia - 2015
  10. Complaint > Rio Bogota Environmental Recuperation and Flood Control Project

    Management Response: 108-Management Response(English)

    ...unknown. The transfer of curies and be used. It should be noted that during construction, some the number and way of life of this species in the reserve have fauna will be able to relocate naturally (e.g., some birds, not been analyzed by CAR. etc.). The suggestions in the Request will b...

    WB Inspection Panel - Colombia - 2016
  11. Complaint > Transport Sector Support Project and its Additional Financing

    Eligibility: Inspection Panel Report and Recommendation

    ...Unknown number of Webuye interchange through (looking at participants – varied. cracked houses, etc.) January 23 and 24, Meeting to discuss is- Task Team and Re- Park Villa Webuye In- 2019: sues of concern and pro- questers terchange posed way forward 41 Kenya ...

    WB Inspection Panel - Kenya - 2018
  12. Complaint > Pando-Monte Lirio Hydroelectric Power Project

    Compliance Report: Publication of Panel Report

    ...unknown. The project will divert the river and it is likely that the remaining 10 percent ecological flow will significantly reduce the depth of the river. The Project has been intensively debated within Management. There have also been discussions with the Board. o Time line of Ecological Flow Discussions Prior to Financial Closure: Prior to the date of financial closure, the IDB demanded that EISA presented in form and substance satisfactory to the Bank the following documents: (a) f...

    IDB Independent Consultation and Investigation Mechanism - Panama - 2012
  13. Complaint > Private Power Generation Project

    Management Response: 44-Management Response (English)

    ...unknown whether Lake Victoria will recharge to the change on power development options in the Nile Equato- high levels and outflow experienced during the 1961- rial Region, including Bujagali. The analysis, using the 2000 period. It is also not known whether such a best available General Circulation Models (GCM), exam- recharge will occur in the next few years or in the ined the impacts of a range of changes in temperature on next 100 ye...

    WB Inspection Panel - Uganda - 2007
  14. Complaint > Lima Urban Transport Project

    Management Response: 61-Management Response (English)

    ...unknown to the Bank. In July 2009, the Bank requested Protransporte to post the EIA on its website again, which was done. In terms of disclosure through the Bank’s Infoshop, a summary of the EIA in English was posted during the appraisal process. Management agrees that this did not meet the require- ...

    WB Inspection Panel - Peru - 2009
  15. Complaint > Nicaragua Sugar Estates Limited-01/Leon and Chinandega

    Agreement: Espanol

    ...unknown cause in Nicaragua, Central America. Am J Kidney Dis 2010;55(3):485-496. Venkatachalam MA, Griffin KA, Lan R. et al., Acute kidney injury: a springboard for progression in chronic kidney disease. Am J Physiol Renal Physiol, 2010. DOI 10.1152/ ajprenal.00017.2010 Wanigasuriya KP, Peiris-John RJ, Wickremasinghe R, et al. Chronic renal failure in North Central Province of Sri Lanka: an environmentally induced disease. Trans R Soc Trop Med Hyg 2007; 101(10): 1013-1017. Yang L, Humphreys BD, ...

    IFC Compliance Advisor/Ombudsman - Nicaragua
  16. Complaint > Tata Ultra Mega-01/Mundra and Anjar

    Compliance Report: English

    ...unknown impact on sea turtle nesting; and (b) that that the “mixing plume of hot water may cause thermal stress prompting deviation of sea turtle movement from normal route traversed to reach sea shore for nesting.” (Ibid.). CAO also notes that a map included in the BNHS study under the title “Map 4 (provided by CGPL). Worst Case Scenario for Thermal dispersion from the outfall channel” (p.21)-and relied upon by BNHS in the preparation of their study-significantly underestimates the maximum exte...

    IFC Compliance Advisor/Ombudsman - India
  17. Complaint > Mumbai Urban Transport Project

    Compliance Review: 32-Investigation Report (English)

    ...unknown to the Bank. 140 The “host communities” 137 PCD for MURP, March 1999, p. 8. 138 Project Information Document, Mumbai Urban Transport Project IN-50668, South Asia Regional Office, Urban Sector, April 1999, p. 1 [hereinafter “PID for MUTP, April 1999”]. 139 PID for MURP Urban Rehabilitation Project IN-PE-50641, South Asia Social Development Sector. March 1999, p. 1 [hereinafter “PID for MURP, March 1999”]. 140 See also Chapter 3A of this report. ...

    WB Inspection Panel - India - 2004
  18. Complaint > Productive Infrastructure Program - Request II: Caracol Industrial Park (MICI)

    Filing: Complaint

    ...unknown. HA-T1179 is meant to assess water availability, quality, and an integrated water resources management in Northern Haiti: HA-L1101 ESS ¶¶2.7-2.8, 4.16-4.17. 339 ActionAid (2015), p. 13: “residents complained that too much water was being captured in the park in light of the 2014 drought.” In an interview, Ilna St Jean reported that a nearby well has run dry and that there is less water in the Trou-du-Nord river, impacting fish (11 July 2016, available on request). 340 See footnot...

    IDB Independent Consultation and Investigation Mechanism - Haiti - 2017
  19. Complaint > Yacyreta Hydroelectric Project

    Eligibility: Inspection Panel Report and Recommendation(English)

    Internationa1 Bank for Recofistauction and Devebpment FOR OFFICIAL USE ONLY INSP/R9&2 FROM: Vice President and Cecretary December 26,1996 INSPECTION PANEL Reauest for Insoection Argentina/Paramav: Yacvretá H...

    WB Inspection Panel - Argentina, Paraguay - 1996
  20. Complaint > Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project

    Eligibility: 22-Eligibility Report (English)

    ...unknown concerning petroleum war, religious war, or ethnic purification (Undated and unsigned) World Bank Responses to Mr. Yorongar 1. Letter from Serge Michailof in response to August 29, 1997 letter (October 7, 1997) 2. Letter from Jean-Louis Sarbib in response to October 3, 1998 letter (November 19, 1998) 104 3. Letter from Serge Michailof in response to October 23, 1998 letter (November 19, 1998) 4. Letter from Serge Michailof in follo...

    WB Inspection Panel - Chad - 2001