Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

8 Results

Showing Only Compliance Review (Show All Results)

Top Results By:

  1. Complaint > Alcazar Energy-01/Jordan

    Compliance Review: COMPLIANCE APPRAISAL: SUMMARY OF RESULTS

    ...Wind Farm (Al Rajef or “the Project”) in February 2016 from Green Watts Renewable Energy LLC. Al Rajef is an 86.1 MW wind power project consisting of 41 wind turbines located in the Ma’an Governorate in southwestern Jordan. The Project was fully operational by November 2018. In February 2020, an individual filed a complaint to CAO alleging noise impacts from the Al Rajef Wind Farm. The complaint was deemed eligible in March 2020, and the complainant requested confidentiality. CAO had diffi...

    IFC Compliance Advisor/Ombudsman - Jordan - 2021
  2. Complaint > Anvil Mining Congo, SARL-01/World Bank President Request

    Compliance Review: Environmental Impact Assessment, Dikulushi Copper Silver Project, April 2003

    ...wind through to the and of riskerosion surrounding ofrwind and amounth of idusatin drcin 2003 Droeptin environment of wind and amount ...

    IFC Compliance Advisor/Ombudsman - Democratic Republic of Congo
  3. Complaint > GCF-EBRD Egypt Renewable Energy Financing Framework

    Compliance Review: Compliance Appraisal Report

    ...wind power subproject to the Programme https://www.greenclimate.fund/document/post-approval-environmental-and-social-safeguardsess-report-fp039-gcf-ebrd-egypt-renewable 8 and strengthening of the regulatory context for renewable energy in Egypt. Component 1 (up to USD 4.7 million in non-reimbursable GCF grant funding) is a technical assistance programme to create an enabling environment for private sector renewable energy investment in Egypt; and Component 2 (up to USD 150 million in reimb...

    GCF Independent Redress Mechanism - Egypt - 2024
  4. Complaint > Gibe III Hydroelectric Power Project

    Compliance Review: PROBLEM SOLVING REPORT

    ...wind power, solar, atomic energy. The Northern part of Kenya is rich in wind power. There is already a wind power project at Lake Turkana where the ADB is a co-financier. Hydropower is the least costly and cleanest option for the four countries at the moment - Ethiopia, Kenya, Djibouti and Sudan • For indigenous peoples living around Lake Turkana, free, prior, informed consent to developments that affect their lands is now firmly entrenched in international law and recognised as such by th...

    AfDB Independent Recourse Mechanism - Ethiopia - 2011
  5. Complaint > GCF-EBRD Egypt Renewable Energy Financing Framework

    Compliance Review: Compliance Appraisal Report 02

    ...wind projects in Egypt totalling USD 1 billion. 8. Implementation of Component 2 includes GCF-financed subprojects at the Benban Solar Park, which is located in Aswan Governorate, Upper Egypt. The site extends to over 37 square kilometres and was anticipated to generate around 1400 GWh electricity annually, equivalent to the annual energy consumption needs of over 800,000 Egyptians.10 The site is divided into a total of 41 sub-plots, with common services and facilities provided by a Facilit...

    GCF Independent Redress Mechanism - Egypt - 2024
  6. Complaint > Karot Hydro-04/Jhelum River

    Compliance Review: Compliance Appraisal Report

    ...wind and hydro projects in Pakistan with a cumulative capacity of over 2,000 MW. IFC’s proposed investment in CSAIL would be an equity investment of up to US$125 million. IFC may also participate in debt financing at the project company level in subsequent transactions. Compliance Appraisal Report – Karot Hydro-04/Jhelum River/Pakistan 14 OFFICIAL USE The ESRS for the loan investment13 in 2015 noted that CSAIL was in the process of developing its HR policy and procedures, which were expect...

    IFC Compliance Advisor/Ombudsman - Pakistan - 2024
  7. Complaint > Lydian (Amulsar Gold Mine) - Extension

    Compliance Review: Compliance Assessment Report

    ...wind direction, speeds and fall out of dust 9 Water 10 Mine and infrastructure manly in Vorotan water shed – baseline studies based on this footprint. 11 Radioactivity 12 From initial concerns – baseline data collected and assessed by UK based specialised consultant’s that prepared a technical note concluding that the background levels obtained werebelow international environmental standards. 13 Use of cyanide 14 Confirmed the use of cyanide in heap leach. Confirmed that Lydian intends t...

    EBRD Independent Project Accountability Mechanism - Armenia - 2020
  8. Complaint > Yacyreta Hydroelectric Project

    Compliance Review: Review and Assessment (English)

    ...wind and waves to break them up. This is a recurring problem of considerable magnitude that should be included specifically in operating costs as well as with respect to environmental impacts and the Ana Cua branch solution. Paraguay side 74. General conditions on the coast near the city of Encarnación indicated that vegetation had been removed prior to the filling to a large extent. Some small patches of emergent or rotting vegetation along the Pa...