Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

5 Results

Showing Only Dispute Resolution (Show All Results)

Top Results By:

  1. Complaint > Alcazar Energy-01/Jordan

    Dispute Resolution: DISPUTE RESOLUTION CONCLUSION REPORT

    ...Wind Farm in Jordan, an 86.1-MW wind farm with a project cost of US$184.6m, located near the village of Al-Rajef in the Ma'an Governate of Jordan. The Al-Rajef Wind Farm commenced commercial operations in November 2018 and was financed by the European Bank for Reconstruction and Development (EBRD), Deutsche Investitions- und Entwicklungsgesellschaft (DEG), and Proparco. IFC was not part of the lender consortium that provided debt finance to the Al-Rajef Wind Farm. 3. THE COMPLAINT I...

    IFC Compliance Advisor/Ombudsman - Jordan - 2021
  2. Complaint > Alcazar Energy-01/Jordan

    Dispute Resolution: CAO ASSESSMENT REPORT

    ...wind and solar projects in the MENA region. IFC’s equity investment in the Company has helped to increase power generation capacity in the region, as well as support economic growth and job creation. The Company currently has seven assets in operation in Egypt and Jordan. The complaint relates specifically to the Al-Rajef Wind Farm in Jordan, an 86.1 MW wind farm with a project cost of US$ 184.6m, located near the village of Al-Rajef in the Ma’an Governate of Jordan. The Al-Rajef Wind Farm...

    IFC Compliance Advisor/Ombudsman - Jordan - 2022
  3. Complaint > Daehan Wind Power Company 01/Tafila

    Dispute Resolution: Dispute Resolution Conclusion Report

    ...Wind Farm project in Tafila and the potential future impacts of its operations. In 2018, IFC, alongside Standard Chartered Bank and Shinhan Bank (both under K-Sure guarantee) extended financing to Daehan Wind Power Company PSC (“Daehan” or “the Company”), to develop, construct, operate, and maintain a 51.75MW wind farm in the Jordan’s Tafila Governorate. In July 2020, CAO determined that the above-mentioned complaint met its three eligibility criteria and began its assessment. Durin...

    IFC Compliance Advisor/Ombudsman - Jordan - 2022
  4. Complaint > Provincial Agricultural Services Program II (PROSAP II)

    Dispute Resolution: Issuance of Consultation Phase Report

    ...winds made it clear that the material at the surface is gradually becoming exposed by erosion. This observation, along with the work done previously by Drs. Gustavo Neme and Adolfo Gil, confirm the existence of stratigraphic levels beneath the surface, making the rescue of the site even more important.” Wind erosion of the archaeological site (photograph from the report by Dr. Michieli) Project Ombudsperson ...

    IDB Independent Consultation and Investigation Mechanism - Argentina - 2011
  5. Complaint > Clean Energy and Network Efficiency Improvement Project

    Dispute Resolution: Final Report (English)

    ...wind and solar power generation. Affected households and impact: The project involved the construction of new substations, upgrading and augmentation of existing substations, construction of transmission lines, construction of distribution gantries and its associated lines, and rooftop solar power generation investments in Sri Lanka. Land acquisition was required only for the construction of the new transmission grid substations and distribution gantries. Approximately 7.70 hectares (ha) o...

    ADB Special Project Facilitator and Compliance Review Panel - Sri Lanka - 2023