DocSearch | Accountability Console
Complaints IAMs Register Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

5 Results

Showing Only Registration (Show All Results)

Top Results By:

  1. Complaint > Eskom Investment Support Project

    Registration: 65-Notice of Registration (English)

    ...Wind Power Project and 100 MW Upington Concentrating Solar Power Project; Component C, which includes sector investments and technical assistance to support lowering Eskom’s carbon intensity through energy efficiency and development of renewable energy, the Majuba Rail Project (railway for coal transportation) and technical assistance for assessing the opportunities for coal-fired power plant efficiency improvements and for the development and implementation of dome...

    WB Inspection Panel - South Africa - 2010
  2. Complaint > Odra-Vistula Flood Management Project - Ninth Request

    Registration: Notice of Registration

    ...winds and more pollution. 8. The Requesters explain that due to the proximity of their property to the works, they live in constant stress and uncertainty, and their peace and sense of security has been destroyed. The Request explains that the property of the Requesters is located about 70 meters from the reservoir, but works are carried out as close as five meters from the residential building. The Requesters claim that the Project was prepared as if no one lived on the property. Acc...

    WB Inspection Panel - Poland - 2019
  3. Complaint > Irrigation System Enhancement Project (Second Request)

    Registration: Notice of Registration-Second Request(English)

    ...wind turbines be built at the reservoir, the 50-year-old pump stations be replaced with modem and energy-efficient pumps designed for current water levels, new reservoirs be built to store water flowing into the Azat 2 The Project consists of three components: (i) Irrigation System Enhancement ($33,1 million); (ii) Management Information ($ L 7 million); and (iii) Project Management and Water Users Associations' Support ($2,7 million). . 3 The Kaghtsrashen and Gegardalich systems are two d...

    WB Inspection Panel - Armenia - 2016
  4. Complaint > Irrigation System Enhancement Project (First Request)

    Registration: 107-Notice of Registration-Second Request(English)

    ...wind turbines be built at the reservoir, the 50-year-old pump stations be replaced with modem and energy-efficient pumps designed for current water levels, new reservoirs be built to store water flowing into the Azat 2 The Project consists of three components: (i) Irrigation System Enhancement ($33,1 million); (ii) Management Information ($ L 7 million); and (iii) Project Management and Water Users Associations' Support ($2,7 million). . 3 The Kaghtsrashen and Gegardalich systems are two d...

    WB Inspection Panel - Armenia - 2016
  5. Complaint > Floods Emergency Recovery Project (P152018)

    Registration: 104-Notice of Non-Registration

    ...wind power generation in Serbia.' 17. In summary, the Panel, when conducting its due diligence to determine the admissibility of this Request, could not establish the existence of plausible links between the alleged harms and the Bank-financed Project. The Panel concludes that the Request does not meet the admissibility criteria for Registration. In light of the foregoing and in accordance with the Panel Resolution, its Clarifications, and its Operating Procedures, the Panel is not regis...

    WB Inspection Panel - Serbia - 2015