Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

88 Results

Showing Only WB Inspection Panel (Show All Results)

Top Results By:

Show All

  1. Complaint > Kosovo Power Project (Proposed)

    Filing: 78-Request for Inspection (English)

    ...Wind Studies on the wind energy potential of Kosovo vary widely. One study [8] was based on meteorological data collected at 10 potential project sites throughout the country. 7 of these 10 sites were found to have wind speeds to slow for commercial viability. Of the remaining 3 locations, the highest wind speed was measured at BBUD, in Budakova. The modeled wind resource at this location is shown in the Figure 9. The estimated annual average wind speed at 38 meters is estimated to be 6.9 m/s. ...

    WB Inspection Panel - Kosovo - 2012
  2. Complaint > Manila Second Sewerage Project (MSSP)

    Other: 28-Map

    ...WINDS* CLAIMANTS' PROVINCES MYANMAR CORAL REEFS FEBRUARY ...

    WB Inspection Panel - Philippines - 2003
  3. Complaint > Eskom Investment Support Project

    Management Response: 65-Management Response (English)

    ...winds, as noted earlier. Marapong and Onverwacht are located upwind, to the north and east of the project site. Downwind of the project site the land use is primarily large game farms with low density human population. Existing (baseline) data show that the highest S02 levels occur in the sparsely populated game farm area to the southwest. With significantly fewer people living downwind than upwind, it is expected that there would be significantly fewer at-risk individuals, and the likelihood of...

    WB Inspection Panel - South Africa - 2010
  4. Complaint > Cartagena Water Supply, Sewerage and Environmental Management Project

    Eligibility: 31-Management Report and Recommendation (English)

    ...winds were neglected in the Project’s analyses. This is only partially true. The actual current records, which include wind effects, were used to predict transport of the waste. Measured currents very near to the surface were not used, however, nor were wind records explicitly used to predict current movement very near to the surface. These phenomena will be further investigated through the use of wind records extending over a period of several years. 13. Annex B assumes winds from the nort...

    WB Inspection Panel - Colombia - 2004
  5. Complaint > Cartagena Water Supply, Sewerage and Environmental Management Project

    Compliance Report: 31-Investigation Report (English)

    ...wind fields, a methodology that does not capture the important influence of the wind on near surface currents in a stratified water column. Below it is shown that 171 Figure 10 a: Wind Direction and 10 x Wind Speed July and Aug 2002. Note predominant wind direction is between 250 and 100 Degrees, with 250 to 360 having a strong onshore direction. (From Dalia Moreno Engel (2004)). Figure 10 b: Wind Direction and 10 x Wind Speed March 2002. Note pred...

    WB Inspection Panel - Colombia - 2004
  6. Complaint > Eskom Investment Support Project

    Eligibility: 65-Eligibility Report and Chairperson Statement (English)

    ...Wind Farm which will also have considerable demonstration impact.43 And though the CSP Plant and the Wind Farm are the largest 35 Management Response, p. 9. 36 Ibid, p. 10. 37 Ibid, p. 32. 38 Ibid, p. 14. 39 Ibid, p. 10. 40 Ibid, p. 7. 41 Ibid, p.3. 42 Ibid, p. 6. 43 Ibid, p. 7. 10 renewable energy projects in the Bank’s FY10 portfolio, Management recognizes that the Project will “skew”44 the rat...

    WB Inspection Panel - South Africa - 2010
  7. Complaint > Eskom Investment Support Project

    Registration: 65-Notice of Registration (English)

    ...Wind Power Project and 100 MW Upington Concentrating Solar Power Project; Component C, which includes sector investments and technical assistance to support lowering Eskom’s carbon intensity through energy efficiency and development of renewable energy, the Majuba Rail Project (railway for coal transportation) and technical assistance for assessing the opportunities for coal-fired power plant efficiency improvements and for the development and implementation of dome...

    WB Inspection Panel - South Africa - 2010
  8. Complaint > Private Power Generation Project

    Filing: 44-Request for Inspection (English)

    ...Wind power potential needs further exploration, as wind speeds have only been recorded at low heights, not the 10 meters that is standard for wind power analysis.11 •Improved, efficient stoves and biogas digesters would be key to bringing cleaner energy to the rural poor, and reduce deforestation from cutting fuel wood. Uganda Government technocrats have dismissed the contribution of these alternative energy options based on their development cos...

    WB Inspection Panel - Uganda - 2007
  9. Complaint > Eskom Investment Support Project

    Eligibility: 65-Management Report and Recommendations (English)

    ...wind of the Medupi 3 Panel Report, paragraph 155. viii Management Report and Recommendation plant under the prevailing wind conditions, and the nearest town of Marapong, a more densely populated area upwind of the plant. On cumulative impacts including water and coal mining-related issues: xvii. Management reviewed the various analyses, assessments and strategic planning studies by the D...

    WB Inspection Panel - South Africa - 2010
  10. Complaint > Transport Sector Support Project and its Additional Financing

    Filing: Request for Inspection

    ...winding route to crossing from one t the other. 8. The working conditions of workers has never been human. The toilets at the construction side were poorly done, got filled and during rainy season used to over flow. This was allegedly rectified when it came to their attention that there was a complain on the project . Those spoken to claim that milk is never given to them as required, no protective cover , poor working relationships. Wi...

    WB Inspection Panel - Kenya - 2018
  11. Complaint > Kenya Energy Sector Recovery Project

    Filing: 79-Request for Inspection (English)

    ...wind of the line (ie the NORMAL wind direction blows across the line before coming to your house} can produce a higher than normal incidence of a number of cancers. The 'safe' distance is about 500 metres, but is less if there are tall trees or high bushes between you and the line as most of the harmful aerosols attach themselves to these before they reach your house. If the wind normally blows in any other direction than towards you from the power lines, then the 120 or 150 metres mentioned abo...

    WB Inspection Panel - Kenya - 2012
  12. Complaint > Private Power Generation Project

    Management Response: 44-Management Response (English)

    ...Wind power potential needs further exploration, The recent Renewable Energy Assessment states as wind speeds have been recorded at low that “due to its geographical location, Uganda does not heights, not the 10 meters that is standard for seem to benefit from good wind resources with most ar- 14 wind power analysis. ...

    WB Inspection Panel - Uganda - 2007
  13. Complaint > Eskom Investment Support Project

    Other: 65-Press Release on Board Discussion (English)

    ...wind and solar power, we are committed to supporting South Africa’s efforts to achieve energy security, to broaden its electrical power sources to include renewable energy, and to address community concerns by supervising and monitoring project implementation in close cooperation with the South African authorities.” He also noted that “Bank Management is committed to have a strong team of experienced specialists in place.” The Executive Directors agreed on the strategic importance of the project...

    WB Inspection Panel - South Africa - 2010
  14. Complaint > Odra-Vistula Flood Management Project - Ninth Request

    Registration: Notice of Registration

    ...winds and more pollution. 8. The Requesters explain that due to the proximity of their property to the works, they live in constant stress and uncertainty, and their peace and sense of security has been destroyed. The Request explains that the property of the Requesters is located about 70 meters from the reservoir, but works are carried out as close as five meters from the residential building. The Requesters claim that the Project was prepared as if no one lived on the property. Acc...

    WB Inspection Panel - Poland - 2019
  15. Complaint > Eskom Investment Support Project

    Compliance Report: 65-Investigation Report (English)

    ...wind impacts on air quality. The wind direction in the affected area of Limpopo Province and neighboring Botswana is predominantly northeasterly. In addition, there are infrequent easterly and westerly winds that could serve to combine emissions from different coal-based energy facilities.194 Cross-border transport of harmful emissions from the Matimba and Medupi Power Plants is thus highly likely,195 although its significance has not been assessed. 383. T...

    WB Inspection Panel - South Africa - 2010
  16. Complaint > National Drainage Program Project

    Management Action Plan: 34-Second Management Progress Report (English)

    ...winds over 100 miles per hour and extremely heavy rains, hit the coastal zone of Pakistan causing severe damages to Karachi and the coast of Balochistan. The cyclone passed over Badin, without producing severe damages to the LBOD outfall system. 5 The SCAD includes: (a) improving access to basic services, including health, education, and drinking water supply and sanitation; (b) increasing incomes through improved crop, fisheries and livestock production as well as marketing and micro-finance ...

    WB Inspection Panel - Pakistan - 2004
  17. Complaint > Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing

    Management Response: 102 - Management Response (English)

    ...wind can supply Mongolia’s rapidly growing demand at present due to their inherently intermittent nature. There is no 8 Mongolia: Updating the Energy Sector Development Plan. ADB Project number 43079. 9 Para 7, page 6, Mongolia: Updating the Energy Sector Development Plan, Part C, Volume VI of X. 17 Mongolia evidence that wind and solar power can provide a full substitute for hydropower and gas or coal fired power plants in Mongolia. 47. ...

    WB Inspection Panel - Mongolia - 2015
  18. Complaint > Irrigation System Enhancement Project (Second Request)

    Registration: Notice of Registration-Second Request(English)

    ...wind turbines be built at the reservoir, the 50-year-old pump stations be replaced with modem and energy-efficient pumps designed for current water levels, new reservoirs be built to store water flowing into the Azat 2 The Project consists of three components: (i) Irrigation System Enhancement ($33,1 million); (ii) Management Information ($ L 7 million); and (iii) Project Management and Water Users Associations' Support ($2,7 million). . 3 The Kaghtsrashen and Gegardalich systems are two d...

    WB Inspection Panel - Armenia - 2016
  19. Complaint > Irrigation System Enhancement Project (First Request)

    Registration: 107-Notice of Registration-Second Request(English)

    ...wind turbines be built at the reservoir, the 50-year-old pump stations be replaced with modem and energy-efficient pumps designed for current water levels, new reservoirs be built to store water flowing into the Azat 2 The Project consists of three components: (i) Irrigation System Enhancement ($33,1 million); (ii) Management Information ($ L 7 million); and (iii) Project Management and Water Users Associations' Support ($2,7 million). . 3 The Kaghtsrashen and Gegardalich systems are two d...

    WB Inspection Panel - Armenia - 2016
  20. Complaint > Floods Emergency Recovery Project (P152018)

    Registration: 104-Notice of Non-Registration

    ...wind power generation in Serbia.' 17. In summary, the Panel, when conducting its due diligence to determine the admissibility of this Request, could not establish the existence of plausible links between the alleged harms and the Bank-financed Project. The Panel concludes that the Request does not meet the admissibility criteria for Registration. In light of the foregoing and in accordance with the Panel Resolution, its Clarifications, and its Operating Procedures, the Panel is not regis...

    WB Inspection Panel - Serbia - 2015