Corridor Vc 2 Project | Accountability Console
Complaints IAMs Register Login

Loading...

Corridor Vc 2 Project

Sectors

Infrastructure

Description:

Projects in this Sector: 591

Browse Projects

Issues Raised

Community health and safety

Description:

Projects with this Issue Raised: 363

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 345

Browse Projects

Other

Description:

Projects with this Issue Raised: 218

Browse Projects

Pollution

Description:

Projects with this Issue Raised: 229

Browse Projects

Property damage

Description:

Projects with this Issue Raised: 169

Browse Projects

Project Information

Investment ID: 47372

Bank: European Bank for Reconstruction and Development

Environmental Category: A

Country: Bosnia and Herzegovina

Region: Europe and Central Asia

Approval Date: Oct. 28, 2015

Investment Types: Loans

Total Project Cost: EUR 118.2 million

Total Complaints: 3

Description

The European Bank for Reconstruction and Development is considering a sovereign loan to BiH of up to EUR 156 million for on-lending to the Federation of Bosnia and Herzegovina (“FBH”) and further to the FBH Motorways. The proceeds of the loan will be used for the construction of four 4-lane motorway sections to international standard as follows: (i) an approximately 7.2 km motorway section between Buna and Pocitelj, and (ii) an approximately 3.9 km motorway section between Donja Gracanica and Zenica Tunnel; (iii) an approximately 5.8 km motorway section between Donja Gracanica and Klopce; and (iv) an approximately 10.4 km motorway section between Svilaj and Odzak. The Project is part of Trans-European Corridor Vc which connects Port of Ploce in Croatia with Budapest and is part of Route 2 of the South-East Europe Transport Observatory’s (SEETO) Comprehensive Network.

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Motorways of the Federation of Bosnia and Herzegovina (FBHM)