Mario Covas Rodoanel Project - Northern Section | Accountability Console
Complaints IAMs Register Login

Loading...

Mario Covas Rodoanel Project - Northern Section

Sectors

Infrastructure

Description:

Projects in this Sector: 592

Browse Projects

Issues Raised

Consultation and disclosure

Description:

Projects with this Issue Raised: 538

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 494

Browse Projects

Environmental

Description:

Projects with this Issue Raised: 408

Browse Projects

Human rights

Description:

Projects with this Issue Raised: 66

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 345

Browse Projects

Pollution

Description:

Projects with this Issue Raised: 229

Browse Projects

Procurement

Description:

Projects with this Issue Raised: 79

Browse Projects

Property damage

Description:

Projects with this Issue Raised: 169

Browse Projects

Project Information

Investment ID: BR-L1296

Bank: Inter-American Development Bank

Environmental Category: A

Country: Brazil

Region: Latin America and the Caribbean

Approval Date: None

Investment Types: Loans

Total Project Cost: USD 3.0 billion

Total Complaints: 3

Description

The general objective is to contribute to the sustainable economic development of the São Paulo Metropolitan Region (SPMR) and to improve the quality of life of its population. The specific objective is to improve mobility, connectivity, safety, and convenience for users of the regional road system through construction of the Northern Section of the beltway, or ÊÀRodoanel,ÊÀ thereby completing the beltway to modern and efficient technical standards of design and operation in terms of road safety, emergency response, and user support.