Contact Us
×Thank you for taking the time to help us improve the Console.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Loading...
Project Information
Investment ID: P089659
Bank: World Bank
Environmental Category: A
Country: Uganda
Region: Sub-Saharan Africa
Approval Date: April 26, 2007
Investment Types:
Total Project Cost: No recorded data on this
Total Complaints: 2
Description
The Private Power Generation (Bujagali) Project's main objective is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The following are the components of the Project: a) the power station which is designed to house the complete generation plant and all five units, and to carry out all operational and maintenance related activities; b) The power intakes which will be capable of operating over the full range of Head Pond levels and turbine discharges without hydraulic instability or vortex formation; c) Spillways and dam embankment; d) The tailrace canalization which will be excavated down to 1,070.5 meters above mean sea level at the outlet of the draft tubes; e) Abutments and substation; f) Access roads; g) Impoundment area; h) Engineering, procurement and transportation; and i) Reservoir filling.
Investments
Investment Type | ID | Amount | Status | Bank | Client |
---|---|---|---|---|---|
P089659 | USD 115.0 million | Planned | WB |
Related Complaints