South-West Roads: Western Europe-Western China International Transit Corridor Project (CAREC 1b & 6b) | Accountability Console
Complaints IAMs Register Login

Loading...

South-West Roads: Western Europe-Western China International Transit Corridor Project (CAREC 1b & 6b)

Issues

Community health and safety

Description: Complaint raises concerns related to public health and safety including incidents of or an increase in accidents, release of hazardous materials, and spread of diseases. Concerns related to retaliation and/or violence are not included.

Complaints with this Issue: 363

Browse Complaints

Consultation and disclosure

Description: Complaint raises concerns regarding inadequate or absent consultation about or disclosure of project information, including project impacts and/or mitigation plans.

Complaints with this Issue: 537

Browse Complaints

Due diligence

Description: Complaint raises concerns about inadequate or absent prior investigation of project impacts.

Complaints with this Issue: 486

Browse Complaints

Livelihoods

Description: Complaint raises concerns about impacts on the means by which people make a living, including wage-based income, trade and bartering, agriculture, fishing, foraging, and other natural-resource based means.

Complaints with this Issue: 345

Browse Complaints

Property damage

Description: Complaint raises concerns about specific harm to property, including buildings, land, or property value. Concerns related to physical or economic displacement, pollution, or community health and safety are not included.

Complaints with this Issue: 169

Browse Complaints

Water

Description: Complaint raises concerns about access to or availability of water. Concerns related to water pollution are not included.

Complaints with this Issue: 194

Browse Complaints

Sectors

Infrastructure

Description: Project relates to construction or improvement of large structures, facilities, or public works projects. Examples include roads and other transportation projects, sanitation and water treatment facilities, power plants, and industrial facilities.

Complaints in this Sector: 994

Browse Complaints

Regulatory Development

Description: Project relates specifically to development or reform of legal frameworks, including laws and regulations.

Complaints in this Sector: 169

Browse Complaints

Description

The Request for Inspection was submitted on December 24, 2020, by four community members from the project area in Kazakhstan. The Requesters have authorized a representative to represent them during the Panel process. The Requesters have asked the Panel to keep their identities confidential. The Request for Inspection pertained to five issues. First, the Requesters alleged that in 2017 eight houses were flooded and sustained material damage as a result of poorly maintained drains for which the project was responsible but not all homeowners were compensated. Second, they alleged that roadworks associated with the project caused floods that blocked private wells, cut off access to a canal that used to supply local households with irrigation water, and disrupted access to natural spring water from an adjacent mountain range. Third, the Requesters alleged that their village has seen an increase in road traffic accidents linked to the roadworks. They also claimed that traffic safety plans have not been adequately consulted on or disclosed to the public. Fourth, the Requesters claimed that a crossing point for cattle under the road was partially blocked with debris because of gravel from the roadworks. Finally, the Requesters alleged a general lack of meaningful consultation and disclosure of information concerning the project, in addition to the alleged inadequate disclosure of the traffic safety plans. In substance, the Requesters allege non-compliance with the Bank’s Policy on Environmental Assessment (OP/BP 4.01).

Complaint Stages

Filing

Dec. 24, 2020

Filing

Status:

Start Date: Dec. 24, 2020

Registration

Dec. 24, 2020 -

Feb. 16, 2021

Registration

Status: Closed With Output

Start Date: Dec. 24, 2020

End Date: Feb. 16, 2021

Eligibility

Feb. 16, 2021 -

April 26, 2021

Eligibility

Status: Closed With Output

Explanation: Mechanism deemed involvement unnecessary

Dispute Resolution

Not Undertaken

Dispute Resolution

Status: Not Undertaken

Explanation: Not offered by mechanism, Stage is not practiced by mechanism

Compliance Review

Not Undertaken

Compliance Review

Status: Not Undertaken

Explanation: Mechanism deemed involvement unnecessary; Case closed in earlier stage, Complaint was originally found ineligible or not registered

Has Compliance Report: No

Non-Compliance Found: No

Monitoring

Not Undertaken

Monitoring

Status: Not Undertaken

Explanation: Case closed in earlier stage, Complaint was originally found ineligible or not registered

Closed

April 26, 2021

Timeline