Complaints | Accountability Console
Complaints IAMs Register Login

Loading...

Issue: Consultation and disclosurex

Complaints

A complaint is a submission to an independent accountability mechanism that raises concerns about actual or potential harm related to an IFI-supported project.


Advanced Filters are only available for registered users. Click here to learn more about registered accounts or login if you already have an account.

Asian Development Bank SPF CRP Complaints IAM Country Date Filed Status
CAREC Corridor 1 (Bishkek-Torugart Road) Project 3 ADB SPF CRP Kyrgyzstan 25/06/2013 Closed Without Outputs
CAREC Transport Corridor I Investment Program ADB SPF CRP Kazakhstan 05/11/2009 Closed With Outputs
Community Empowerment for Rural Development Project ADB SPF CRP Indonesia 21/02/2005 Closed With Outputs
Decentralized Rural Infrastructure and Livelihood Project ADB SPF CRP Nepal 10/11/2014 Closed With Outputs
East-West Highway Improvement Project ADB SPF CRP Azerbaijan 02/09/2009 Closed Without Outputs
GMS Mekong Tourism Development Project ADB SPF CRP Vietnam 13/12/2006 Closed Without Outputs
Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia Project ADB SPF CRP Cambodia 23/08/2015 Closed Without Outputs
Integrated Citarum Water Resources Management Investment Program ADB SPF CRP Indonesia 08/12/2009 Closed Without Outputs
Kerala Sustainable Urban Development Project 2 ADB SPF CRP India 14/08/2012 Closed Without Outputs
Khulna-Jessore Drainage Rehabilitation Project ADB SPF CRP Bangladesh 04/01/2006 Closed Without Outputs
Melamchi Water Supply Project (MWSP) ADB SPF CRP Nepal 03/05/2004 Closed Without Outputs
Multitranche Financing Facility Road Network Development Program ADB SPF CRP Azerbaijan 03/09/2009 Closed Without Outputs
Mundra Ultra Mega Power Project ADB SPF CRP India 19/09/2013 Monitoring
National Capital Region Urban Infrastructure Financing Facility - Tranche 1 ADB SPF CRP India 18/02/2015 Closed Without Outputs
National Highway Development Sector Investment Program ADB SPF CRP Pakistan 09/09/2006 Closed With Outputs
National Trade Corridor Highway Investment Program ADB SPF CRP Pakistan 24/04/2009 Closed Without Outputs
Promoting Economic Use of Customary Land and Grant No. 0392 (SAM): Samoa Agribusiness Support Project ADB SPF CRP Samoa 03/09/2014 Closed Without Outputs
Proposed MFF National Trade Corridor Highway Investment Program - Hasanabdal-Havelian Section (Project 2) ADB SPF CRP Pakistan 06/10/2011 Closed Without Outputs
Rehabilitation of the Railway in Cambodia Project ADB SPF CRP Cambodia 21/11/2011 Monitoring
Rehabilitation of the Railway in Cambodia Project 2 ADB SPF CRP Cambodia 13/04/2012 Closed Without Outputs
Rural Electrification, Distribution and Transmission Project-Thankot-Chapagaun-Bhaktapur 132 kV Transmission Line ADB SPF CRP Nepal 25/04/2006 Closed Without Outputs
Secondary Towns Integrated Urban Environmental Improvement Project 2 ADB SPF CRP Nepal 20/01/2014 Closed Without Outputs
Southern Agriculture Area Development Project ADB SPF CRP Kyrgyzstan 28/09/2010 Closed Without Outputs
Southern Punjab Basic Urban Services Project ADB SPF CRP Pakistan 27/02/2009 Closed With Outputs
Southern Transport Development Project (STDP) ADB SPF CRP Sri Lanka 09/06/2004 Closed With Outputs
Sustainable Urban Transport Investment Program ADB SPF CRP Georgia 27/10/2010 Closed Without Outputs
Visayas Base-Load Power Project ADB SPF CRP Philippines 28/02/2011 Monitoring
Zvartnots Airport Expansion Project ADB SPF CRP Armenia 06/06/2013 Closed Without Outputs
Sustainable Urban Transport Investment Program - Tranche 3 ADB SPF CRP Georgia 21/05/2018 Active
Nenskra Hydropower Project ADB SPF CRP Georgia 18/11/2017 Active
Promoting Economic Use of Customary Land and Samoa AgriBusiness Support Project ADB SPF CRP Samoa 13/04/2016 Active
Ulaanbaatar Urban Services and Ger Areas Development Investment Program - Tranche 1 ADB SPF CRP Mongolia 21/03/2018 Active
Third Urban Governance and Infrastructure Improvement (Sector) Project - Additional Financing ADB SPF CRP Bangladesh 13/10/2017 Closed Without Outputs
Clean Energy and Network Efficiency Improvement Project ADB SPF CRP Sri Lanka 24/08/2017 Closed Without Outputs
Greater Colombo Water and Wastewater Management Improvement Investment Program - Tranche 3 ADB SPF CRP Sri Lanka 11/03/2017 Closed Without Outputs
MFF Sustainable Urban Transport Investment - Program Tranche 3 ADB SPF CRP Georgia 13/05/2016 Closed Without Outputs
Tanahu Hydropower Project ADB SPF CRP Nepal 17/07/2018 Closed Without Outputs
Pehur High Level Canal Extension Project ADB SPF CRP Pakistan 05/02/2019 Active
MFF Power Transmission Enhancement Investment Program II Tranche 3 ADB SPF CRP Pakistan 18/05/2019 Active
Air Quality Improvement in the Greater Beijing-Tianjin-Hebei Region--Shandong Clean Heating and Cooling Project ADB SPF CRP China 16/07/2019 Closed Without Outputs
European Bank for Reconstruction and Development IRM Complaints IAM Country Date Filed Status
Vlore Thermal Power Generation Project EBRD IRM Albania 19/04/2007 Closed With Outputs
European Bank for Reconstruction and Development PCM Complaints IAM Country Date Filed Status
Altain Khuder debt & equity EBRD PCM Mongolia 30/12/2014 Closed With Outputs
DIF Lydian (Amulsar Gold Mine) EBRD PCM Armenia 29/07/2014 Closed Without Outputs
DIF Lydian (Amulsar Gold Mine) 2 EBRD PCM Armenia 29/10/2014 Closed Without Outputs
Dariali HPP EBRD PCM Georgia 24/11/2014 Closed With Outputs
EPS Kolubara Environmental Improvement EBRD PCM Serbia 24/08/2012 Monitoring
EPS Power II EBRD PCM Serbia 16/08/2013 Closed With Outputs
Energy Resources Phase II & Oyu Tolgoi EBRD PCM Mongolia 02/07/2013 Closed With Outputs
IPP4 Al-Manakher Power Project EBRD PCM Jordan 03/08/2015 Closed With Outputs
Oltenia - Turceni Rehabilitation EBRD PCM Romania 11/07/2014 Closed With Outputs Outside Process
Ombla Hydro Power Plant EBRD PCM Croatia 17/11/2011 Monitoring
Paravani Hydro Power Plant EBRD PCM Georgia 22/12/2011 Monitoring
Rivne Kyiv High Voltage Line EBRD PCM Ukraine 10/01/2012 Closed With Outputs
Tbilisi Railway Bypass 1 EBRD PCM Georgia 07/03/2011 Closed With Outputs
Tbilisi Railway Bypass 2 EBRD PCM Georgia 07/03/2011 Closed With Outputs
MHP Corporate Support Loan, MHP Biogas EBRD PCM Ukraine 05/06/2018 Active
Nenskra HPP EBRD PCM Georgia 30/05/2018 Active
Lukoil Shah Deniz Stage II EBRD PCM Azerbaijan 25/01/2018 Closed Without Outputs
Agroinvestbank Equity Investment EBRD PCM Tajikistan 31/01/2018 Closed Without Outputs
Kozloduy International Decommissioning Support Fund EBRD PCM Bulgaria 07/03/2018 Active
BEH Bond Issue EBRD PCM Bulgaria 16/10/2017 Active
Belgrade Public Transport and Traffic Infrastructure EBRD PCM Serbia 10/05/2016 Active
Lukoil Shah Deniz Stage II EBRD PCM Azerbaijan 05/09/2017 Active
Belgrade Public Transport and Traffic Infrastructure EBRD PCM Serbia 10/05/2016 Active
Krnovo Wind Farm EBRD PCM Montenegro 02/03/2017 Closed With Outputs
EPS Restructuring EBRD PCM Serbia 16/02/2016 Closed With Outputs
Shuakhevi HPP EBRD PCM Georgia 16/07/2018 Active
European Investment Bank CM Complaints IAM Country Date Filed Status
AES Sonel - Electricity Supply EIB CM Cameroon 20/01/2014 Closed Without Outputs
Bujagali-hydroelectric EIB CM Uganda 24/02/2009 Closed With Outputs
Cairo Metro Line 3 (Phase 3) EIB CM Egypt 04/01/2012 Closed Without Outputs
Corridor 10 Highway E-75 EIB CM Serbia 03/05/2011 Closed Without Outputs
DTS Expressway II EIB CM Poland 15/01/2010 Closed Without Outputs
EMS Electricity Network Upgrading EIB CM Serbia 21/09/2014 Closed With Outputs
Eirgrid East-West Interconnector TEN-E EIB CM Ireland 03/11/2010 Closed Without Outputs
Gilgel Gibe 3 EIB CM Ethiopia 08/06/2010 Closed With Outputs
M11 Gorey to Enniscorthy Road EIB CM Ireland 21/02/2010 Closed Without Outputs
MOZAL II EIB CM Mozambique 26/10/2010 Closed With Outputs
Mariscina County Waste Management EIB CM Croatia 05/03/2013 Closed Without Outputs
Medio Ambiente Water Infrastructure EIB CM Spain 08/10/2013 Closed With Outputs Outside Process
Mediterranean Railway Corridor EIB CM Spain 13/05/2014 Closed Without Outputs
Mediterranean Railway Corridor 2 EIB CM Spain 26/01/2015 Closed Without Outputs
Motorway A-2 2 EIB CM Poland 09/07/2010 Closed Without Outputs
Motorways D1 EIB CM Slovakia 19/10/2009 Closed With Outputs
Municipal and Regional Infrastructure Loan EIB CM Serbia 29/02/2012 Closed Without Outputs
Municipal and Regional Infrastructure Loan 2 EIB CM Serbia 07/10/2014 Closed Without Outputs
Nuweiba Power Plant Project EIB CM Egypt 19/05/2009 Closed Without Outputs
Olkaria A EIB CM Kenya 16/07/2014 Closed With Outputs
Olkaria B EIB CM Kenya 31/07/2014 Closed With Outputs
Rivne-Kyiv High Voltage Line EIB CM Ukraine 05/07/2012 Closed Without Outputs
South Poland CHP, Bielsko-Biala, Poland EIB CM Poland 29/03/2011 Closed Without Outputs
South Sinai Power Plant EIB CM Egypt 19/05/2009 Closed Without Outputs
Tajikistan Framework Agreement EIB CM Tajikistan 25/03/2009 Closed Without Outputs
Terminal Contenedores Cadiz EIB CM Spain 02/01/2012 Closed Without Outputs
Thermal Power Plant Sostanj EIB CM Slovenia 03/05/2012 Closed Without Outputs
Transport Lending Policy EIB CM Unknown 07/11/2008 Closed With Outputs
Warsaw Ring Road EIB CM Poland 07/02/2011 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Italy 15/11/2017 Active
E70 Grigoleti-Kobuleti Bypass EIB CM Georgia 12/10/2017 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Italy 26/09/2017 Closed Without Outputs
Cairo Metro Line 3 (Phase 3) EIB CM Egypt 21/07/2017 Active
Regional Mombasa Port Access Road EIB CM Kenya 17/07/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 04/07/2017 Closed With Outputs
Trans Adriatic Pipeline EIB CM Italy 03/07/2017 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Italy 03/07/2017 Closed Without Outputs
Georgia East-West Highway EIB CM Georgia 27/06/2017 Active
Trans Adriatic Pipeline EIB CM Albania 01/06/2017 Closed Without Outputs
Regional Mombasa Port Access Road EIB CM Kenya 25/05/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 22/05/2017 Active
Regional Mombasa Port Access Road EIB CM Kenya 19/05/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 09/05/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 03/04/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 29/03/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 29/03/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 27/03/2017 Closed With Outputs
Cairo Metro Line 3 (Phase 3) EIB CM Egypt 02/03/2017 Active
Regional Mombasa Port Access Road EIB CM Kenya 02/03/2017 Closed With Outputs
Regional Mombasa Port Access Road EIB CM Kenya 01/03/2017 Closed With Outputs
Georgia East-West Highway EIB CM Georgia 09/01/2017 Active
Trans Adriatic Pipeline EIB CM Albania 29/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 29/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 29/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 07/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 07/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 07/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 02/09/2016 Closed Without Outputs
Trans Adriatic Pipeline EIB CM Albania 02/09/2016 Closed Without Outputs
Cairo Metro Line 3 (Phase 3) EIB CM Egypt 19/06/2016 Closed Without Outputs
D4R7 Slovakia PPP EIB CM Slovakia 03/06/2016 Closed Without Outputs
Georgia East-West Highway EIB CM Georgia 21/04/2016 Active
Réseau Ferroviaire Rapide EIB CM Tunisia 06/04/2016 Active
Nam Theun 2 Hydroelectric EIB CM 06/04/2016 Active
Rocade Extérieure du Grand Tunis EIB CM Tunisia 08/01/2016 Closed Without Outputs
Bangalore Metro Rail Project Line R6 EIB CM India 06/06/2019 Active
Kharkiv Metro Expansion EIB CM Ukraine 22/01/2019 Active
Modernisation Routiere I EIB CM Tunisia 01/07/2018 Active
Modernisation Routiere I EIB CM Tunisia 09/05/2018 Active
Modernisation Routiere I EIB CM Tunisia 17/05/2018 Active
Spain Gas Network Expansion II EIB CM Spain 12/07/2018 Closed Without Outputs
Devenish Nutrition EIB CM Ireland 30/08/2018 Closed Without Outputs
Nepal Power System Expansion EIB CM Nepal 07/10/2018 Active
ONEE Project Eolien EIB CM Morocco 21/10/2018 Active
Inter-American Development Bank MICI Complaints IAM Country Date Filed Status
Agrifood Health and Quality Management Program (CCLIP) IDB MICI Argentina 12/01/2012 Closed With Outputs
Bayport Colombia: Financial Inclusion for BOP Public Employees IDB MICI Colombia 07/03/2015 Closed Without Outputs
Blumenau Urban Sustainable Mobility Program IDB MICI Brazil 09/08/2013 Closed Without Outputs
Blumenau Urban Sustainable Mobility Program, on behalf of 800 residents of the neighborhood of Ponta Aguda in Blumenau IDB MICI Brazil 12/03/2014 Closed Without Outputs
El Dorado International Airport IDB MICI Colombia 12/08/2011 Monitoring
Estrada Nova Watershed Sanitation IDB MICI Brazil 22/10/2010 Closed With Outputs
La Paz Storm Drainage Program II IDB MICI Bolivia 27/03/2014 Closed With Outputs
Marena Renovables Wind Project 2 IDB MICI Mexico 28/12/2012 Closed With Outputs
Mario Covas Rodoanel Project - Northern Section 1 (2011) IDB MICI Brazil 13/05/2011 Closed Without Outputs
Multiphase Development Infrastructure Program: Support Production in Entre Rios IDB MICI Argentina 28/06/2010 Closed With Outputs
Panama Canal Expansion Program IDB MICI Panama 10/10/2011 Closed With Outputs
Pando-Monte Lirio Hydroelectric Power Project IDB MICI Panama 12/03/2010 Closed With Outputs
Programa de Mejoramiento de Barrios II (PROMEBA II) IDB MICI Argentina 24/11/2010 Closed With Outputs Outside Process
Rural Land Titling & Registration Project in Peru - Third Phase IDB MICI Peru 27/08/2015 Monitoring
San Francisco-Mocoa Alternate Road Construction Project - Phase I IDB MICI Colombia 13/07/2011 Closed Without Outputs
Santa Barbara-Rurrenabaque Northern Corridor Highway Improvement Program IDB MICI Bolivia 28/02/2011 Closed With Outputs
Sao Jose dos Campos Urban Structuring Program IDB MICI Brazil 10/06/2011 Monitoring
Strategic Public Transportation Systems (SPTS) IDB MICI Colombia 01/01/2015 Closed Without Outputs
Support for Structuring the Ituango Hydroelectric Project IDB MICI Colombia 05/06/2018 Active
São José dos Campos Urban Structuring Program- Request II IDB MICI Brazil 27/04/2018 Closed Without Outputs
Program for the Reconstruction of Electricity Infrastructure in Areas Affected by the Earthquake in Ecuador IDB MICI Ecuador 20/04/2018 Active
Energy Sustainable Program IDB MICI Chile 08/01/2018 Closed Without Outputs
São José dos Campos Urban Structuring Program IDB MICI Brazil 11/12/2017 Closed Without Outputs
Establishing Cadastral Registry & Strengthening Legal Certainty Protected Areas IDB MICI Guatemala 14/08/2017 Closed Without Outputs
Protection and Recovery of Cultural Heritage Assets Program IDB MICI Ecuador 26/07/2017 Closed Without Outputs
Tietê Várzeas Program IDB MICI Brazil 25/07/2017 Closed Without Outputs
Alto Maipo Hydroelectric Power Project IDB MICI Chile 23/01/2017 Active
Tietê Várzea Program IDB MICI Brazil 08/11/2016 Closed Without Outputs
Tietê Várzea Program IDB MICI Brazil 29/07/2016 Closed Without Outputs
Tietê Várzea Program IDB MICI Brazil 28/07/2016 Closed With Outputs Outside Process
Mario Covas Rodoanel Project - Northern Section IDB MICI Brazil 13/06/2016 Closed Without Outputs
Downtown Redevelopment, Modernization of Metropolitan Public Transport, and of Government Offices Project IDB MICI Paraguay 17/05/2016 Active
Downtown Redevelopment, Modernization Metropolitan Public Transport and Government Offices IDB MICI Paraguay 11/03/2016 Closed Without Outputs
Strategic Program for Transportation Infrastructure and Logistics in Paraná IDB MICI Brazil 04/09/2018 Closed Without Outputs
Rehabilitation and Housing Program of the Bañado Sur in Asunción (Barrio Tacumbú) IDB MICI Paraguay 27/11/2018 Closed Without Outputs
Maués Integrated Sanitation Program - PROSAIMAUÉS IDB MICI Brazil 12/09/2019 Active
Railroad General Roca Improvement Program - Constitución - La Plata Line IDB MICI Argentina 12/06/2019 Active
Reconquista River Basin Environmental Sanitation Program- Request III IDB MICI Argentina 07/05/2019 Active
Reconquista River Basin Environmental Sanitation Program- Request II IDB MICI Argentina 04/04/2019 Closed Without Outputs
Reconstruction Program of the electricity infrastructure in the areas affected by the earthquake in Ecuador (EC-L1219) – Request II IDB MICI Ecuador 05/03/2019 Closed Without Outputs
Productive and Tourism Infrastructure Program for the Province of Rio Negro IDB MICI Argentina 28/02/2019 Active
Plazalogística SA IDB MICI Argentina 11/02/2019 Closed Without Outputs
São José dos Campos Urban Structuring Program- Request III IDB MICI Brazil 04/02/2019 Active
IFC/MIGA CAO Complaints IAM Country Date Filed Status
AD Hydro Power Limited-01/Himachal Pradesh IFC CAO India 01/10/2004 Closed With Outputs
AD Hydro Power Limited-02/Jagat Sukh IFC CAO India 01/08/2005 Closed Without Outputs
Africa Investco-01 IFC CAO Mauritius 28/03/2012 Closed With Outputs Outside Process
Agrokasa-01/Ica IFC CAO Peru 02/06/2009 Closed With Outputs
Alex Dev-01/Wadi al-Qamar IFC CAO Egypt 09/04/2015 Active
Amaggi Expansion-01/IFC Executive Vice President Request IFC CAO Brazil 01/11/2004 Closed With Outputs
Atul Ltd.-01/Gujarat IFC CAO India 01/06/2006 Closed With Outputs
Axzon-01/Halych and Kalush IFC CAO Ukraine 03/02/2014 Active
BTC Pipeline-01/ Switzerland IFC CAO Azerbaijan, Georgia, Turkey 01/12/2003 Closed Without Outputs
BTC Pipeline-02/Rustavi IFC CAO Georgia 16/03/2004 Closed With Outputs
BTC Pipeline-07/Dgvari IFC CAO Georgia 21/05/2004 Closed With Outputs Outside Process
BTC Pipeline-10/Tetritskaro IFC CAO Georgia 21/05/2004 Closed With Outputs
BTC Pipeline-12/Tba, Tsemi, Sadgeri IFC CAO Georgia 28/05/2004 Closed With Outputs Outside Process
BTC Pipeline-16/Tetritsakro IFC CAO Georgia 01/12/2004 Closed Without Outputs
BTC Pipeline-21/Posof IFC CAO Turkey 21/06/2005 Closed Without Outputs
BTC Pipeline-26/Krstanisi IFC CAO Georgia 12/12/2005 Closed Without Outputs
BTC Pipeline-31/Naokhrebi IFC CAO Georgia 28/02/2008 Closed Without Outputs
Bujagali Energy-04/Bujagali IFC CAO Uganda 21/03/2011 Monitoring
Bujagali-02/Bujagali Falls IFC CAO Uganda 19/06/2001 Closed Without Outputs
Bulyanhulu Project-01 IFC CAO Tanzania 01/01/2002 Closed Without Outputs
CAMIF-01/ Intibuca IFC CAO Honduras 09/10/2013 Closed Without Outputs
CIFI-01/Santa Cruz IFC CAO Guatemala 15/07/2015 Active
Cambodia Airport II-01/Preah Sihanouk IFC CAO Cambodia 11/12/2009 Closed With Outputs
Cambodia Airports-01/Phnom Penh IFC CAO Cambodia 07/06/2013 Monitoring
Celulosas de M'Bopicua (CMB) & Orion-01/Argentina & Uruguay IFC CAO Argentina, Uruguay 01/09/2005 Closed With Outputs
Chemplast-01/ Cuddalore District IFC CAO India 01/06/2002 Closed Without Outputs
Compania Minera Antamina S.A.-01/ Huarmey IFC CAO Peru 01/09/2000 Closed Without Outputs
Compania Minera Antamina S.A.-02/Huarmey IFC CAO Peru 01/05/2005 Closed Without Outputs
Comsur V-01/Bosque Chiquitano IFC CAO Bolivia 01/06/2003 Closed With Outputs
Dinant-01/CAO Vice President Request IFC CAO Honduras 17/04/2012 Monitoring
Eco Oro-01/Bucaramanga IFC CAO Colombia 13/06/2012 Active
Empresa Electrica Pangue S.A.-02/Upper Bio-Bio Watershed IFC CAO Chile 01/07/2002 Closed With Outputs
Ficohsa-02/Tela IFC CAO Honduras 09/10/2015 Active
Financial Intermediaries-01/CAO Vice President Request IFC CAO World 01/04/2011 Monitoring
India Infrastructure Fund-01/Dhenkanal District IFC CAO India 15/04/2011 Active
Ingenio Montelimar-01/Montelimar Environs IFC CAO Nicaragua 01/10/2015 Active
Interagua-01/Guayaquil IFC CAO Ecuador 01/01/2008 Closed With Outputs
KEK-01/Prishtina IFC CAO Kosovo 25/08/2011 Closed With Outputs
Kalahari Diamond-01/Kalahari IFC CAO Botswana 01/11/2004 Closed Without Outputs
Konkola Copper Mines Plc (KCM)-01/Ming'omba and Kawama IFC CAO Zambia 01/07/2003 Closed Without Outputs
Lydian Intl3-01/Gndevaz & Jermuk IFC CAO Armenia 16/04/2014 Closed With Outputs
Lydian Intl3-02/Gndevaz IFC CAO Armenia 25/07/2014 Closed With Outputs
Mahindra Farm Services-01/Confidential IFC CAO India 04/03/2007 Closed Without Outputs
Mahindra Farm Services-02/Confidential IFC CAO India 04/03/2007 Closed Without Outputs
Mahindra Farm Services-03/Confidential IFC CAO India 04/03/2007 Closed Without Outputs
Mahindra Farm Services-04/Confidential IFC CAO India 04/03/2007 Closed Without Outputs
Maple Energy-01/Nuevo Sucre and Canaan IFC CAO Peru 06/04/2010 Closed Without Outputs
Marlin-01/Sipacapa IFC CAO Guatemala 01/01/2005 Closed Without Outputs
Mindoro Resources-01/Jabonga IFC CAO Philippines 16/09/2011 Closed Without Outputs
Mozal-01/Matola and Maputo IFC CAO Mozambique 01/10/2010 Closed With Outputs
Niger Delta Contractor Revolving Credit Facility-01/Niger Delta IFC CAO Nigeria 01/06/2001 Closed Without Outputs
PNG SEZ-01/Madang Province IFC CAO Papua New Guinea 12/07/2011 Closed With Outputs
Pan African Paper-01/Webuye IFC CAO Kenya 01/02/2008 Closed Without Outputs
Pando Montelirio-01/Chiriqui IFC CAO Panama 27/01/2010 Closed Without Outputs
Quellaveco-01/Moquegua IFC CAO Peru 26/11/2011 Monitoring
Rainforest Ecolodge Linkages-01/Deniyaya IFC CAO Sri Lanka 20/08/2009 Closed With Outputs
Ramky-01/ Gummidipoondi IFC CAO India 01/08/2005 Closed Without Outputs
Ramky-02/Mumbai IFC CAO India 01/09/2005 Closed Without Outputs
Ramky-03/Gummidipoondi IFC CAO India 19/10/2007 Closed Without Outputs
Real LRIF-01/Coban IFC CAO Guatemala 29/10/2014 Active
Russkiy Mir II-01/Taman IFC CAO Russia 01/10/2007 Closed Without Outputs
TCBuen-01/Buenaventura IFC CAO Colombia 09/12/2009 Closed Without Outputs
TCQ-01/Puerto Quetzal IFC CAO Guatemala 20/03/2014 Closed Without Outputs
Tsodilo-01/Badplaas IFC CAO South Africa 22/04/2013 Closed Without Outputs
VEIL II-01/ Ratanakiri Province IFC CAO Cambodia 10/02/2014 Monitoring
Wilmar Group-01/West Kalimantan IFC CAO Indonesia 01/07/2007 Closed With Outputs
Wilmar Group-02/Sumatra IFC CAO Indonesia 01/12/2008 Closed With Outputs
Yanacocha-02/Cajamarca IFC CAO Peru 01/03/2001 Closed With Outputs
Alto Maipo-01/Cajon del Maipo IFC CAO Chile 24/01/2017 Active
Bridge International Academies-1/Kenya IFC CAO Kenya 16/04/2018 Active
MPS-01/Tema IFC CAO Ghana 26/02/2018 Closed Without Outputs
Myanma Awba Group Company Ltd.-01/Myanmar IFC CAO Myanmar 04/10/2017 Active
Nedbank-01/Kintinian IFC CAO Guinea 27/04/2017 Active
Rajmandala Hydropower Project-01/Bantarcaringin Kampong IFC CAO Indonesia 16/05/2016 Closed With Outputs
Reventazon HPP-02/Siquirres IFC CAO Costa Rica 20/12/2016 Active
Rizal Commercial Banking Corporation (RCBC)-01 IFC CAO Philippines 11/10/2017 Active
Yanacocha-09/Cajamarca IFC CAO Peru 17/01/2017 Active
Trans-Anatolian Pipeline-02/ Garajemirli IFC CAO Azerbaijan, Georgia, Turkey 26/10/2018 Active
Galnaftogaz-01/Kiev IFC CAO Ukraine 08/08/2018 Active
Condor Gold-01/Santa Cruz de la India IFC CAO Nicaragua 26/07/2018 Closed Without Outputs
PL IV-01/Multiple locations IFC CAO Panama 18/06/2018 Active
MHP-01/Vinnytsia IFC CAO Ukraine 05/06/2018 Active
CBG-01/Sangaredi IFC CAO Guinea 26/02/2019 Active
Salala Rubber Corporation-01/Margibi and Bong IFC CAO Liberia 27/05/2019 Active
Overseas Private Investment Corporation OA Complaints IAM Country Date Filed Status
Mexico Cerro de Oro Hydroelectric OPIC OA Mexico 30/11/2010 Closed With Outputs
World Bank Panel Complaints IAM Country Date Filed Status
Arun III Proposed Hydroelectric Project and Restructuring of IDA Credit WB Panel Nepal 24/10/1994 Closed With Outputs
Bogota Urban Services Project WB Panel Colombia 30/10/2007 Closed Without Outputs
Cartagena Water Supply, Sewerage and Environmental Management Project WB Panel Colombia 20/04/2004 Closed With Outputs
Coal Sector Mitigation Project and Coal Sector Rehabitation Project WB Panel India 21/06/2001 Closed With Outputs
Development Forestry Sector Management Project WB Panel Liberia 24/09/2010 Closed With Outputs Outside Process
Education Improvement Project WB Panel Armenia 16/05/2014 Closed Without Outputs
Energy Loss Reduction Project (Rogun HPP, Tajikistan) WB Panel Tajikistan, Uzbekistan 08/10/2010 Closed Without Outputs
Export Development Project (not registered) WB Panel Kenya 21/04/2009 Closed Without Outputs
Forest Concession Management and Control Pilot Project WB Panel Cambodia 28/01/2005 Closed With Outputs
Giza North Power Project WB Panel Egypt 21/02/2013 Closed With Outputs Outside Process
Greater Beirut Water Supply Project WB Panel Lebanon 04/11/2010 Closed With Outputs Outside Process
Haiti Mining Dialogue Technical Assistance WB Panel Haiti 07/01/2015 Closed Without Outputs
Indigenous and Community Biodiversity Project (COINBIO) WB Panel Mexico 26/01/2004 Closed Without Outputs
Institutional Reform Development Policy Financing WB Panel Yemen 13/04/2009 Closed With Outputs Outside Process
Integrated Coastal Zone Management and Clean-Up Project, First Request WB Panel Albania 30/07/2007 Closed With Outputs
Jamuna Multipurpose Bridge Project WB Panel Bangladesh 23/08/1996 Closed With Outputs Outside Process
Jute Sector Adjustment Credit Project WB Panel Bangladesh 13/11/1996 Closed Without Outputs
Kenya Energy Sector Recovery Project WB Panel Kenya 10/05/2012 Closed With Outputs Outside Process
Kosovo Power Project (Proposed) WB Panel Kosovo 29/03/2012 Closed Without Outputs
Lagos Drainage and Sanitation Project WB Panel Nigeria 17/06/1998 Closed With Outputs Outside Process
Lagos Metropolitan Development and Governance Project WB Panel Nigeria 30/09/2013 Closed With Outputs Outside Process
Lake Victoria Environmental Management Project WB Panel Kenya 12/10/1999 Closed With Outputs
Land Administration Project WB Panel Honduras 03/01/2006 Closed With Outputs
Land Administration Project (First Request) WB Panel Panama 25/02/2009 Closed With Outputs
Land Management and Administration Project WB Panel Cambodia 04/09/2009 Closed With Outputs
Land Reform and Poverty Alleviation Project, 1st Request WB Panel Brazil 14/12/1998 Closed Without Outputs
Land Reform and Poverty Alleviation Project, 2nd Request WB Panel Brazil 14/09/1999 Closed Without Outputs
Manila Second Sewerage Project (MSSP) WB Panel Philippines 26/09/2003 Closed Without Outputs
Mining Development and Environmental Control Assistance Project WB Panel Ecuador 13/12/1999 Closed With Outputs
Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing WB Panel Mongolia 10/02/2015 Closed Without Outputs
Mumbai Urban Transport Project WB Panel India 28/04/2004 Closed With Outputs
NTPC I Power Generation Project WB Panel India 01/05/1997 Closed With Outputs
National Drainage Program Project WB Panel Pakistan 10/09/2004 Closed With Outputs
Natural Resource Management Project WB Panel Kenya 14/01/2013 Closed With Outputs
Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project WB Panel Chad 22/03/2001 Closed With Outputs
Petroleum Development and Pipeline Project, and Petroleum Environment Capacity Enhancement Project WB Panel Cameroon 25/09/2002 Closed With Outputs
Power Development Project WB Panel Nepal 10/07/2013 Monitoring
Private Power Generation Project WB Panel Uganda 05/03/2007 Closed With Outputs
Red Sea - Dead Sea Water Conveyance Study Program WB Panel Gaza, Israel, Jordan, West Bank 24/06/2011 Closed Without Outputs
Santa Fe Road Infrastructure Project and Provincial Road Infrastructure Project, 3rd Request WB Panel Argentina 13/09/2007 Closed With Outputs
Second National Water Development Project - AdditionalFinancing WB Panel Malawi 22/05/2013 Closed Without Outputs
Second Norte Grande Water Infrastructure Project WB Panel Argentina 04/05/2011 Closed Without Outputs
Second Tamil Nadu Road Sector Project WB Panel India 19/12/2014 Closed Without Outputs
Second Urban Environment Sanitation Project WB Panel Ghana 16/08/2007 Closed With Outputs
Smallholder Agriculture Development Project WB Panel Papua New Guinea 08/12/2009 Closed With Outputs
South-West Roads: Western Europe-Western China International Transit Corridor (CAREC-1b & 6b) (Second Request) WB Panel Kazakhstan 15/06/2011 Closed With Outputs Outside Process
Special Structural Adjustment Loan WB Panel Argentina 26/07/1999 Closed With Outputs Outside Process
Sustainable Agriculture and Rural Development Project WB Panel Paraguay 22/07/2014 Closed With Outputs Outside Process
Third Power Project, Fourth Power Project, and proposed Bujagali Hydropower Project WB Panel Uganda 27/07/2001 Closed With Outputs
Transitional Support for Economic Recovery Credit and Emergency Economic and Social Reunification Support Project WB Panel Democratic Republic of Congo 19/11/2005 Closed With Outputs
Urban Development Project and Douala Infrastructure Development Project (not registered) WB Panel Cameroon 05/09/2007 Closed Without Outputs
Uttaranchal Decentralized Watershed Development Project WB Panel India 07/03/2007 Closed With Outputs Outside Process
Vishnugad Pipalkoti Hydro Electric Project WB Panel India 23/07/2012 Monitoring
West African Gas Pipeline Project WB Panel Ghana, Nigeria 27/04/2006 Closed With Outputs
Western Poverty Reduction Project WB Panel China 18/06/1999 Closed With Outputs
Yacyreta Hydroelectric Project WB Panel Argentina, Paraguay 30/09/1996 Closed With Outputs Outside Process
Amaravati Sustainable Capital City Development Project WB Panel India 25/03/2017 Active
Floods Emergency Recovery Project WB Panel Serbia 06/01/2017 Closed Without Outputs
Water and Sanitation Service Improvement Project and Water and Sanitation Service Improvement Project - Additional Financing WB Panel Kenya 29/11/2016 Closed Without Outputs
Andhra Pradesh & Telengana Road Sector and National Highways Interconnectivity Improvement Project WB Panel India 11/09/2016 Closed Without Outputs
Trade and Transport Studies RETF Project WB Panel Bangladesh 31/08/2016 Closed Without Outputs
Rio Bogota Environmental Recuperation and Flood Control Project WB Panel Colombia 29/06/2016 Closed With Outputs Outside Process
Irrigation System Enhancement Project (First Request) WB Panel Armenia 18/03/2016 Closed With Outputs Outside Process
Irrigation System Enhancement Project (Second Request) WB Panel Armenia 03/03/2016 Closed With Outputs Outside Process
Mining Infrastructure Investment Support and Mining Infrastructure Support - Additional Financing WB Panel Mongolia 02/04/2018 Closed Without Outputs
Water Supply Augmentation Project, Greater Beirut Water Supply Project and its Additional Financing WB Panel Lebanon 06/08/2018 Closed Without Outputs
Mining Infrastructure Investment Support and Mining Infrastructure Support - Additional Financing WB Panel Mongolia 02/04/2018 Closed Without Outputs
Rural Water Supply and Sanitation Project for Low Income States - First Request WB Panel India 21/09/2018 Active
Rural Water Supply and Sanitation Project for Low Income States - Second Request WB Panel India 12/12/2018 Active
Transport Sector Support Project and its Additional Financing WB Panel Kenya 17/12/2018 Active
Nairobi Metropolitan Services Improvement Project WB Panel Kenya 10/04/2019 Closed Without Outputs
Natural Resource Management Project and Kenya Climate Smart Agriculture Project, and Kenya Urban Support Program WB Panel Kenya 15/04/2019 Closed Without Outputs
Odra-Vistula Flood Management Project - First Request WB Panel Poland 21/06/2019 Active
Odra-Vistula Flood Management Project - Second Request WB Panel Poland 11/07/2019 Active
Odra-Vistula Flood Management Project - Third Request WB Panel Poland 12/07/2019 Active
Odra-Vistula Flood Management Project - Fourth Request WB Panel Poland 15/07/2019 Active
Odra-Vistula Flood Management Project - Fifth Request WB Panel Poland 15/07/2019 Active
Teresina Enhancing Municipal Governance and Quality of Life Project and its Additional Financing WB Panel Brazil 23/08/2019 Active
Odra-Vistula Flood Management Project - Seventh Request WB Panel Poland 04/09/2019 Active