Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

184 Results

Top Results By:

Show All

  1. Complaint > Eskom Investment Support Project

    Eligibility: 65-Eligibility Report and Chairperson Statement (English)

    ...Wind Farm which will also have considerable demonstration impact.43 And though the CSP Plant and the Wind Farm are the largest 35 Management Response, p. 9. 36 Ibid, p. 10. 37 Ibid, p. 32. 38 Ibid, p. 14. 39 Ibid, p. 10. 40 Ibid, p. 7. 41 Ibid, p.3. 42 Ibid, p. 6. 43 Ibid, p. 7. 10 renewable energy projects in the Bank’s FY10 portfolio, Management recognizes that the Project will “skew”44 the rat...

    WB Inspection Panel - South Africa - 2010
  2. Complaint > Eskom Investment Support Project

    Registration: 65-Notice of Registration (English)

    ...Wind Power Project and 100 MW Upington Concentrating Solar Power Project; Component C, which includes sector investments and technical assistance to support lowering Eskom’s carbon intensity through energy efficiency and development of renewable energy, the Majuba Rail Project (railway for coal transportation) and technical assistance for assessing the opportunities for coal-fired power plant efficiency improvements and for the development and implementation of dome...

    WB Inspection Panel - South Africa - 2010
  3. Complaint > Private Power Generation Project

    Filing: 44-Request for Inspection (English)

    ...Wind power potential needs further exploration, as wind speeds have only been recorded at low heights, not the 10 meters that is standard for wind power analysis.11 •Improved, efficient stoves and biogas digesters would be key to bringing cleaner energy to the rural poor, and reduce deforestation from cutting fuel wood. Uganda Government technocrats have dismissed the contribution of these alternative energy options based on their development cos...

    WB Inspection Panel - Uganda - 2007
  4. Complaint > Krnovo Wind Farm

    Timeline: Processing steps

    ...Wind Farm Project number: 44546 Country: Montenegro Step Date Remarks 1. Complaint received by the 2 March 2017 Complaint is received by PCM Officer. email. 2. Complaint is registered 6 March 2017 according to PCM RPs 11-13. Relevant parties are informed. 3. PCM Expert Susan Wildau is 7 March 2017 appointed as Eligibility Assessment Expert for the Complaint. Her ass...

    EBRD Project Complaint Mechanism - Montenegro
  5. Complaint > Alex Dev-01/Wadi al-Qamar

    Eligibility: CAO Assessment Report - Alex Dev -01 April 2016 English

    ...winds in this coastal region are largely northwesterly, resulting in a wind corridor that carries cement dust and fumes from the plant and adversely impacts the residential area adjacent to the plant. Residents who filed the complaint reported that one of the operating industries, located next to the cement plant, won a court ruling establishing that its salt beds were covered by cement dust carried by the northwesterly winds. Residents also indicated that pollution from the plant is adversely i...

    IFC Compliance Advisor/Ombudsman - Egypt - 2016
  6. Complaint > Rawalpindi Environmental Improvement Project (Sewage Treatment Plant Component)

    Filing: Complaint received, 28 May 2009

    ...wind 6 direction. In case of Jabbar Miana land is being acquired at a distance of less than 300m from the houses both on north and west of the village??? And there is no mention of wind direction considerations in the SEIA. 7. ADB policy on Involuntary Resettlement provides for compensation to AP’s, at least equal to the "without" project situation. In our case th...

    ADB Special Project Facilitator and Compliance Review Panel - Pakistan - 2009
  7. Complaint > EPS Restructuring

    Eligibility: Eligibility Assessment Report

    ...wind protection embankment along the complete line of the exploitation field. The wind protection embankment is 2-2.5 m high. In the area of CM Veliki Crljeni, from Magnet gas station to the U-turn and the turn for OCM Tamnava West Field in its full length over the spatial width from the wind protection embankment to Ibar Highway, there are numerous planted woody plants with branched crowns several decades old which largely prevent expansion of suspended particles emission from OCM Veliki Crljen...

    EBRD Project Complaint Mechanism - Serbia
  8. Complaint > Eskom Investment Support Project

    Eligibility: 65-Management Report and Recommendations (English)

    ...wind of the Medupi 3 Panel Report, paragraph 155. viii Management Report and Recommendation plant under the prevailing wind conditions, and the nearest town of Marapong, a more densely populated area upwind of the plant. On cumulative impacts including water and coal mining-related issues: xvii. Management reviewed the various analyses, assessments and strategic planning studies by the D...

    WB Inspection Panel - South Africa - 2010
  9. Complaint > Transport Sector Support Project and its Additional Financing

    Filing: Request for Inspection

    ...winding route to crossing from one t the other. 8. The working conditions of workers has never been human. The toilets at the construction side were poorly done, got filled and during rainy season used to over flow. This was allegedly rectified when it came to their attention that there was a complain on the project . Those spoken to claim that milk is never given to them as required, no protective cover , poor working relationships. Wi...

    WB Inspection Panel - Kenya - 2018
  10. Complaint > Oyu Tolgoi-01/Khanbogd

    Filing: Letter of complaint (redacted), October 12, 2012

    ...wind and cold.6 In addition, the possibility of land freezing under the thin layer of animal droppings in the animal shelters was not taken into account, which led to big losses of livestock in the 2004 zud7 for all resettled households, resulting in a drop in living conditions. The ground under animal droppings in our winter camps, which were used for generations by herder households, does not freeze, keeping animals warm during the winter. In addition, the diminished quantity and quality of pa...

    IFC Compliance Advisor/Ombudsman - Mongolia - 2012
  11. Complaint > SN Power-01/CAO Vice President Request

    Appraisal: CAO Appraisal: Case of IFC and MIGA involvement with SN Power with special focus on the Allain Duhangan Hydropower Project in India, December 17, 2009

    ...wind farm also in Chile, and the Allain Duhangan hydroelectric power plant in India. 8. The objectives of the appraisal were defined to address the concerns raised in the CAO VP request for an appraisal: a. The extent to which IFC/MIGA’s supervision and monitoring had identified and addressed the issues raised; b. To identify whether potential systemic concerns and opportunities to enhance health and safety performance ...

    IFC Compliance Advisor/Ombudsman - India - 2009
  12. Complaint > Provincial Agricultural Services Program II (PROSAP II)

    Dispute Resolution: Issuance of Consultation Phase Report

    ...winds made it clear that the material at the surface is gradually becoming exposed by erosion. This observation, along with the work done previously by Drs. Gustavo Neme and Adolfo Gil, confirm the existence of stratigraphic levels beneath the surface, making the rescue of the site even more important.” Wind erosion of the archaeological site (photograph from the report by Dr. Michieli) Project Ombudsperson ...

    IDB Independent Consultation and Investigation Mechanism - Argentina - 2011
  13. Complaint > AD Hydro Power Limited-01/Himachal Pradesh

    Appraisal: appraisal

    ...wind farm also in Chile, and the Allain Duhangan hydroelectric power plant in India. 8. The objectives of the appraisal were defined to address the concerns raised in the CAO VP request for an appraisal: a. The extent to which IFC/MIGA’s supervision and monitoring had identified and addressed the issues raised; b. To identify whether potential systemic concerns and opportunities to enhance health and safety performance ...

    IFC Compliance Advisor/Ombudsman - India
  14. Complaint > Paravani Hydro Power Plant

    Filing: Complaint

    ...wind, geothermal and bio energy alternatives to the central option. However, one it does not properly analyse alternative sources of energy generation, instead giving only background descriptions of these renewable alternatives without making a detailed comparative analysis with the central option. It does not include either financial calculations -- how much will be needed for implementing such projects - or costs of these renewable energy projects. According to the response of the EBRD, “A pro...

    EBRD Project Complaint Mechanism - Georgia
  15. Complaint > Kenya Energy Sector Recovery Project

    Filing: 79-Request for Inspection (English)

    ...wind of the line (ie the NORMAL wind direction blows across the line before coming to your house} can produce a higher than normal incidence of a number of cancers. The 'safe' distance is about 500 metres, but is less if there are tall trees or high bushes between you and the line as most of the harmful aerosols attach themselves to these before they reach your house. If the wind normally blows in any other direction than towards you from the power lines, then the 120 or 150 metres mentioned abo...

    WB Inspection Panel - Kenya - 2012
  16. Complaint > Mundra Ultra Mega Power Project

    Monitoring: CRP 1st Annual Monitoring Report in English and in Gujarati

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action1 S...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2016
  17. Complaint > Private Power Generation Project

    Management Response: 44-Management Response (English)

    ...Wind power potential needs further exploration, The recent Renewable Energy Assessment states as wind speeds have been recorded at low that “due to its geographical location, Uganda does not heights, not the 10 meters that is standard for seem to benefit from good wind resources with most ar- 14 wind power analysis. ...

    WB Inspection Panel - Uganda - 2007
  18. Complaint > Anvil Mining Congo, SARL-01/World Bank President Request

    Compliance Review: Environmental Impact Assessment, Dikulushi Copper Silver Project, April 2003

    ...wind through to the and of riskerosion surrounding ofrwind and amounth of idusatin drcin 2003 Droeptin environment of wind and amount of d...

    IFC Compliance Advisor/Ombudsman - Democratic Republic of Congo
  19. Complaint > Mundra Ultra Mega Power Project

    Monitoring: CRP 2nd Annual Monitoring Report in English and in Gujarati

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action1 Scheduled Dat...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2017
  20. Complaint > Mundra Ultra Mega Power Project

    Monitoring: CRP 3nd Annual Monitoring Report in English and in Gujarati

    ...wind and intercept coal dust will develop (planted in 2012). (iii) A 9 m tall wind barrier has been constructed along the Vandh village-ward plant boundary, adjoining the coal stockyard to arrest the movement of coal dust. (iv) The height of coal piles over one-third of the Vandh village-ward length has been restricted to below 6 m. Further Corrective Action 1 Scheduled Dat...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2018