Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

189 Results

Top Results By:

Show All

  1. Complaint > Lima Urban Transport Project

    Management Response: 61-Management Response (English)

    ...unknown to the Bank. In July 2009, the Bank requested Protransporte to post the EIA on its website again, which was done. In terms of disclosure through the Bank’s Infoshop, a summary of the EIA in English was posted during the appraisal process. Management agrees that this did not meet the require- ...

    WB Inspection Panel - Peru - 2009
  2. Complaint > Tata Ultra Mega-01/Mundra and Anjar

    Compliance Report: English

    ...unknown impact on sea turtle nesting; and (b) that that the “mixing plume of hot water may cause thermal stress prompting deviation of sea turtle movement from normal route traversed to reach sea shore for nesting.” (Ibid.). CAO also notes that a map included in the BNHS study under the title “Map 4 (provided by CGPL). Worst Case Scenario for Thermal dispersion from the outfall channel” (p.21)-and relied upon by BNHS in the preparation of their study-significantly underestimates the maximum exte...

    IFC Compliance Advisor/Ombudsman - India
  3. Complaint > Pando-Monte Lirio Hydroelectric Power Project

    Compliance Report: Publication of Panel Report

    ...unknown. The project will divert the river and it is likely that the remaining 10 percent ecological flow will significantly reduce the depth of the river. The Project has been intensively debated within Management. There have also been discussions with the Board. o Time line of Ecological Flow Discussions Prior to Financial Closure: Prior to the date of financial closure, the IDB demanded that EISA presented in form and substance satisfactory to the Bank the following documents: (a) f...

    IDB Independent Consultation and Investigation Mechanism - Panama - 2012
  4. Complaint > Nicaragua Sugar Estates Limited-01/Leon and Chinandega

    Agreement: Espanol

    ...unknown cause in Nicaragua, Central America. Am J Kidney Dis 2010;55(3):485-496. Venkatachalam MA, Griffin KA, Lan R. et al., Acute kidney injury: a springboard for progression in chronic kidney disease. Am J Physiol Renal Physiol, 2010. DOI 10.1152/ ajprenal.00017.2010 Wanigasuriya KP, Peiris-John RJ, Wickremasinghe R, et al. Chronic renal failure in North Central Province of Sri Lanka: an environmentally induced disease. Trans R Soc Trop Med Hyg 2007; 101(10): 1013-1017. Yang L, Humphreys BD, ...

    IFC Compliance Advisor/Ombudsman - Nicaragua
  5. Complaint > Private Power Generation Project

    Management Response: 44-Management Response (English)

    ...unknown whether Lake Victoria will recharge to the change on power development options in the Nile Equato- high levels and outflow experienced during the 1961- rial Region, including Bujagali. The analysis, using the 2000 period. It is also not known whether such a best available General Circulation Models (GCM), exam- recharge will occur in the next few years or in the ined the impacts of a range of changes in temperature on next 100 ye...

    WB Inspection Panel - Uganda - 2007
  6. Complaint > Petroleum Development and Pipeline Project, and Petroleum Environment Capacity Enhancement Project

    Management Response: 27-Management Response (English)

    ...unknown mechanism in Cameroon and that the learning and adjustment process needed to be completed before FEDEC could become the effective tool it is meant to be. FEDEC now has a place in the institutional landscape for environmental management in Cameroon and further actions are being taken and/or prepared to strengthen its activities. 29. An international consultant will be contracted by end November 2002 to start a comprehensive training program for all staff of CPSP and sectoral ministrie...

    WB Inspection Panel - Cameroon - 2002
  7. Complaint > Third Power Project, Fourth Power Project, and proposed Bujagali Hydropower Project

    Management Response: 24-Management Response (English)

    ...unknown. Hence no prior EIAs were done for the Old Owen Falls Dam. This is further compounded by the fact that to date no post-construction EIA has been done for the old Owen Falls Dam.” RESPONSE: 53. IDA conducted environmental and social analyses of Owen Falls Extension in 1990, consistent with the intent of OMS 2.36 on Environmental Aspects of Bank Work, May 1984. OD 4.00 (1989) was not applicable because the Power III Project was initiated in 1988. IDA subsequently co...

    WB Inspection Panel - Uganda - 2001
  8. Complaint > Rio Bogota Environmental Recuperation and Flood Control Project

    Management Response: 108-Management Response(English)

    ...unknown. The transfer of curies and be used. It should be noted that during construction, some the number and way of life of this species in the reserve have fauna will be able to relocate naturally (e.g., some birds, not been analyzed by CAR. etc.). The suggestions in the Request w...

    WB Inspection Panel - Colombia - 2016
  9. Complaint > Proposed Kosovo Power Project and Second Additional Financing Energy Sector Clean-up and Land Reclamation Project

    Management Response: 103-Management Response

    ...unknown capacity (refer page 39) 17. ISSUE: 2004 Emergency Displacement is a legacy issue for the The resettlement for the 2004 emergency displacement KPP that must be addressed. was carried out by UNMIK and PISG and was not part of any Bank-supported project. CLAIM: Livelihoods of 158 families (664 people) affected by 2004 Emergency Disp...

    WB Inspection Panel - Kosovo - 2015
  10. Complaint > Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing

    Management Response: 102 - Management Response (English)

    ...unknown guard the consultation meeting. The Bank team promptly requested the whether and how stakeholder Policies, PMU to remedy this. The PMU was very responsive and agreed to comments were taken into includ- extend the closing date to receive comments from November 28 to consideration in further devel- ing but December 5, 2014. opment of those ToR. not lim- ited to Management notes that the revised ToR ...

    WB Inspection Panel - Mongolia - 2015
  11. Complaint > Transport Sector Support Project and its Additional Financing

    Eligibility: Inspection Panel Report and Recommendation

    ...Unknown number of Webuye interchange through (looking at participants – varied. cracked houses, etc.) January 23 and 24, Meeting to discuss is- Task Team and Re- Park Villa Webuye In- 2019: sues of concern and pro- questers terchange posed way forward 41 Kenya ...

    WB Inspection Panel - Kenya - 2018
  12. Complaint > Second Rural Enterprise Support Project

    Management Response: 89-Management Response and Addendum (English)

    ...unknown. In addition at the project level. Management recognizes the need to to Navruz, there were several tragic deaths. expand RESP II’s labor provisions to include adequate Igor Yachkevskiy, a 55-year old resident of measures against forced labor and will also incorporate this Tashkent city, died of a heart...

    WB Inspection Panel - Uzbekistan - 2013
  13. Complaint > Daehan Wind Power Company 01/Tafila

    Management Response: Compliance Appraisal Report

    ...unknown in the Project area and surroundings. The ornithologists based in the field for this Project and other WPPs also confirmed that they have never observed nor reported any such activities. Should it be evidenced that any birds legally raised belong to the priority species as identified in the CEA, the Company must apply rigorous measures to mitigate any collision risk (as described in paragraph 42 above). In case any birds legally raised (which are not listed in the priority species) ...

    IFC Compliance Advisor/Ombudsman - Jordan - 2022
  14. Complaint > Mumbai Urban Transport Project

    Compliance Review: 32-Investigation Report (English)

    ...unknown to the Bank. 140 The “host communities” 137 PCD for MURP, March 1999, p. 8. 138 Project Information Document, Mumbai Urban Transport Project IN-50668, South Asia Regional Office, Urban Sector, April 1999, p. 1 [hereinafter “PID for MUTP, April 1999”]. 139 PID for MURP Urban Rehabilitation Project IN-PE-50641, South Asia Social Development Sector. March 1999, p. 1 [hereinafter “PID for MURP, March 1999”]. 140 See also Chapter 3A of this report. ...

    WB Inspection Panel - India - 2004
  15. Complaint > Yacyreta Hydroelectric Project

    Eligibility: Inspection Panel Report and Recommendation(English)

    Internationa1 Bank for Recofistauction and Devebpment FOR OFFICIAL USE ONLY INSP/R9&2 FROM: Vice President and Cecretary December 26,1996 INSPECTION PANEL Reauest for Insoection Argentina/Paramav: Yacv...

    WB Inspection Panel - Argentina, Paraguay - 1996
  16. Complaint > EPS Kolubara Environmental Improvement

    Eligibility: Eligibility Assessment Report

    ...unknown whether the Project group acted at all. [27] The third stage of policy of MB Kolubara and EPS regarding Vreoci, from mid 2010 to now, began with the decision of the Council of MZ Vreoci from June 28, 2010 to suspend its participation in the Committee for monitoring of Vreoci resettlement and in the Committee for monitoring the Vreoci graveyard relocation. The decision was taken at a citizens' gathering attended by hundreds of citizens and a large number of members of ES "Vreoci". With th...

    EBRD Project Complaint Mechanism - Serbia
  17. Complaint > Dinant-01/CAO Vice President Request

    Compliance Report: English

    ...unknown gunmen attacked a group of private security guards, killing four and wounding 180 11.” According to civil society sources, 35 people affiliated with the peasant movement in the Aguán were victims of homicide in 2011.181 Specific allegations are made linking at least 15 of these killings to Dinant properties or security guards.182 Dinant does not provide IFC with an AMR for 2011. Year: 2012 The next supervision visit is organized in April 2012. The BTOR from th...

    IFC Compliance Advisor/Ombudsman - Honduras
  18. Complaint > None

    Policy Document: 2013 Annual Report

    ...unknown to science and scientific research needs to continue. Independent research into the causality has been carried out by Boston University, whose team was jointly chosen by the parties. Research has indicated that the type of CKD affecting former NSEL workers is also present in other industries in Nicaragua and throughout the Pacific zone of Central America. The findings suggest some evidence of early-stage kidney damage in adolescents who have not yet entered the workforce, which...

    -
  19. Complaint > Productive Infrastructure Program - Request II: Caracol Industrial Park (MICI)

    Filing: Complaint

    ...unknown. HA-T1179 is meant to assess water availability, quality, and an integrated water resources management in Northern Haiti: HA-L1101 ESS ¶¶2.7-2.8, 4.16-4.17. 339 ActionAid (2015), p. 13: “residents complained that too much water was being captured in the park in light of the 2014 drought.” In an interview, Ilna St Jean reported that a nearby well has run dry and that there is less water in the Trou-du-Nord river, impacting fish (11 July 2016, available on request). 340 See footnot...

    IDB Independent Consultation and Investigation Mechanism - Haiti - 2017
  20. Complaint > Private Power Generation Project

    Management Response: 44-Management Report and Recommendation

    ...unknown, based on currently available data and information, whether cumulative effects on health and educational services or on cultural/spiritual sites might be identified. It seems unlikely that there are cumulative effects on white-water rafting, as these activities are not believed to have been commercially available a...

    WB Inspection Panel - Uganda - 2007