Irrigation System Enhancement Project (Second Request) | Accountability Console
Complaints IAMs Register Login

Loading...

Irrigation System Enhancement Project (Second Request)

Issues

Consultation and disclosure

Description: Complaint raises concerns regarding inadequate or absent consultation about or disclosure of project information, including project impacts and/or mitigation plans.

Complaints with this Issue: 538

Browse Complaints

Environmental

Description: Complaint raises concerns regarding environmental impacts that do not refer specifically to water, pollution, or biodiversity.

Complaints with this Issue: 408

Browse Complaints

Water

Description: Complaint raises concerns about access to or availability of water. Concerns related to water pollution are not included.

Complaints with this Issue: 195

Browse Complaints

Sectors

Infrastructure

Description: Project relates to construction or improvement of large structures, facilities, or public works projects. Examples include roads and other transportation projects, sanitation and water treatment facilities, power plants, and industrial facilities.

Complaints in this Sector: 995

Browse Complaints

Regulatory Development

Description: Project relates specifically to development or reform of legal frameworks, including laws and regulations.

Complaints in this Sector: 169

Browse Complaints

Project

Name: Irrigation System Enhancement Project

Investments: WB P127759

Client: Republic of Armenia, Water Sector Development unit PIU

Support:

Country: Armenia

Complaint

IAM: Inspection Panel (Panel)

ID: 107

Date Filed: March 3, 2016

Date Closed: July 20, 2017

Status: Closed With Outputs Outside Process

Description

—On March 18, 2016, the Inspection Panel received a Request for Inspection (Case No. 106) raising concerns relating to the Irrigation System Enhancement Project in Armenia. The Requesters were concerned about lack of water for irrigation and inadequate consultation and participation. The Panel reviewed the Request in accordance with its procedures to determine its admissibility and issued a ‰ÛÏNotice of Registration‰Û on April 26, 2016. The Inspection Panel on May 3, 2016, received a second Request (Case No. 107) related to the same project. The Requesters were concerned about a lack of water for gravity irrigation, the destruction of the Azat Gorge with impacts on tourism, and issues relating to consultation and participation. The Panel issued a Notice of Registration on May 24, and, since both Requests raised similar issues relating to gravity irrigation under the same project, the Panel decided to process them jointly.

Complaint Stages

Filing

March 3, 2016

Filing

Status:

Start Date: March 3, 2016

Registration

March 3, 2016 -

May 24, 2016

Registration

Status: Closed With Output

Start Date: March 3, 2016

End Date: May 24, 2016

Eligibility

May 24, 2016 -

July 20, 2017

Eligibility

Status: Closed With Output

Explanation: Addressed outside process, Management is addressing or has addressed concerns

Dispute Resolution

Not Undertaken

Dispute Resolution

Status: Not Undertaken

Start Date: None

Compliance Review

Not Undertaken

Compliance Review

Status: Not Undertaken

Start Date: None

Has Compliance Report: No

Non-Compliance Found: No

Monitoring

Not Undertaken

Monitoring

Status: Not Undertaken

Start Date: None

Closed

July 20, 2017

Timeline

Documents

Name Category Description
2016 Õ©-Հաշվեհարդարից Ուղեցույցներ (հայերեն) Other 2016 թ-Հաշվեհարդարից Ուղեցույցներ (հայերեն).pdf
Final Report and Recommendation-28 June 2017(English) Eligibility Final Report and Recommendation-28 June 2017(English).pdf
Notice of Registration-First Request (English) Registration Notice of Registration-First Request (English).pdf
Notice of Registration-Second Request(English) Registration Notice of Registration-Second Request(English).pdf
ԾԱՆՈՒՑՈՒՄ ԳՐԱՑՄԱՆ ՄԱՍԻՆ-Երկրորդ հայցը (հայերեն) Other ԾԱՆՈՒՑՈՒՄ ԳՐԱՑՄԱՆ ՄԱՍԻՆ-Երկրորդ հայցը (հայերեն).pdf
Ծանուցման գրանցման-Ô±Õ¼Õ¡Õ»Õ«Õ¶ ( հայերեն) Other Ծանուցման գրանցման-Առաջին ( հայերեն).pdf
Ստուգող խորհրդի հաշվետվությունը և (հայերեն) Compliance Report Ստուգող խորհրդի հաշվետվությունը և (հայերեն).pdf
ՎԵՐՋՆԱԿԱՆ ՀԱՇՎԵՏՎՈՒԹՅՈՒՆԸ և ԱՌԱՋԱՐԿՈՒԹՅՈՒՆԸ- Հունիսի 28, 2017Õ© Compliance Report ՎԵՐՋՆԱԿԱՆ ՀԱՇՎԵՏՎՈՒԹՅՈՒՆԸ և ԱՌԱՋԱՐԿՈՒԹՅՈՒՆԸ- Հունիսի 28, 2017թ.pdf
Report and Recommendation(English) Eligibility Report and Recommendation(English).pdf