DocSearch | Accountability Console
Complaints IAMs Register Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

38 Results

Showing Only Filing (Show All Results)

Top Results By:

  1. Complaint > Interagua-01/Guayaquil

    Filing: English Part 1

    ...unknown, and through a more efficient collection of water resources.”2 According to MIGA, “the new project is expected to contribute to the enhancement of health and living conditions for the local population, while at the same time reducing the cost of water for those now depending on other water sources.”3 2. The participation of MIGA in the Project MIGA granted the Interagua project a guarantee of $18 million in 2001. According to MIGA, “the project represents MIGA’s first covera...

    IFC Compliance Advisor/Ombudsman - Ecuador
  2. Complaint > Mongolia Mining Infrastructure Investment Support (P118109) and Mining Infrastructure Investment Support - Additional Financing

    Filing: 102 - Request for Inspection (English)

    ...unknown whether and how stakeholder comments were taken into consideration in further development of those TOR. • The Shuren Hydro design on which all hydrological and economic calculations were based was known to threaten the huge water intake facility of Erdenet city. Threatening public water supply • Shuren Project personnel knew that, but until summer 2014 they did not disclose ...

    WB Inspection Panel - Mongolia - 2015
  3. Complaint > Power Development Project

    Filing: 87-Request for Inspection (English)

    ...unknown] (hereinafter “EIA Executive Summary”). 6 EIA Executive Summary, at 2. Interview by Komala Ramachandra with Surendraswor Moktan, Chairperson of the Protest Committee, Member of the Tamang indigenous community, resident of Majhitar, Kamalamai Municipality, Sindhuli District, Ward No. 7 (June 4, 2013). Notes of interviews are on file with Accountability Counsel and available upon request. including ten in Sindhuli District.7 Project documents indicate that a 15-meter right of way (“RoW...

    WB Inspection Panel - Nepal - 2013
  4. Complaint > Proposed Kosovo Power Project and Second Additional Financing Energy Sector Clean-up and Land Reclamation Project

    Filing: 103-Request for Inspection

    ...unknown, future project liabilities with each incremental , quasi-emergency resettlement. 136 OP 4.12, Annex A, ii 20 including footnote 6. 137 OP 4. 12 Para. 33. 42 Profit and Loss ...

    WB Inspection Panel - Kosovo - 2015
  5. Complaint > Ituango Hydropower Plant

    Filing: Request Receipt

    ...unknown. This is contrary to the international standards and best practices established for this type of project.92 The Policy establishes that: “1. Every effort will be made to avoid or minimize the need for involuntary resettlement. A thorough analysis of project alternatives must be carried out in order to identify solutions that are economically and technically feasible while eliminating or minimizing the need for involuntary resettlement.” In addition, accord...

    IDB Independent Consultation and Investigation Mechanism - Colombia - 2018
  6. Complaint > Altain Khuder debt & equity

    Filing: Complaint

    ...unknown number of herders who once had grazing lands in the area where the mine is now located are also displaced. Some herders said that resettlement continues to this day to make way for the mine’s expansion. Inadequate compensation Altain Khuder’s resettlement programme includes cash compensation but not allocation of new land. Despite the highly complex, customary and collective land system, negotiations took place on an individual basis without involvement of the soum or aimag, while compen...

    EBRD Project Complaint Mechanism - Mongolia
  7. Complaint > Transitional Support for Economic Recovery Credit and Emergency Economic and Social Reunification Support Project

    Filing: 37-Request for Inspection Annex 25

    ...Unknown Chancellery Tax 3 000.00 RVM General Tax $26 446.? H. VILLE City Council Tax $118.? ONATRA Berthing Tax ...

    WB Inspection Panel - Democratic Republic of Congo - 2005
  8. Complaint > Improving Rural Livelihoods through Carbon Sequestration Project

    Filing: 80-Request for Inspection (English)

    ...unknown territory. He is driven by passion, commitment and conviction. But he was stopped. By none other than the World Bank on which he is banking. Why? He asks? What wrong have I committed? He questions, "While the World Bank organizes conclaves to inspire the youth to take greater responsibilities, why is it not supporting a youngster to represent a project with which itself partnered? He sought an answer, "how do I reach the international community to benefit from their collecti...

    WB Inspection Panel - India - 2010
  9. Complaint > Sustainable Development of Natural Resources - Additional Financing, and Sustainable Development of Natural Resources II

    Filing: 83-Second Request for Inspection (English)

    ...unknown destinations rather than put themselves at risk in their designated new location, while others returned home but were forcefully removed by the police. Information to those affected has been lacking, adding to the uncertainty and fear. There has been no authoritative statement on how many villages and which ones are to be relocated during which phase of the process.11 VII. Conference After the World Bank’s failure to organize a serious meeting consisting of independent experts (see C...

    WB Inspection Panel - Afghanistan - 2012
  10. Complaint > Tax Administration Reform Project

    Filing: 64-Request for Inspection Annexes (English)

    ...unknown darkness (of the scenarios given in Para 4) and throwing oneself at the mercy of the Establishment Division. That it is also possible that pe.titioners opt for IRS and would finally find themselves in the PRS without opting for it (Para 4(b) of O:M.); m) Creating a new occupational group and seeking irrevocable options from • I . Customs and Excise Group and Income T~ Group to join the same W...

    WB Inspection Panel - Pakistan - 2009
  11. Complaint > Second Rural Enterprise Support Project

    Filing: 89-Request for Inspection (English and Russian)

    ...unknown. In addition to Navruz, there were several tragic deaths. Igor Yachkevskiy, a 55-year old resident of Tashkent city, died of a heart attack while picking cotton in Okkurgon district, Tashkent region on the 17th of September.9Umid, a third year student of the Bukhara Engineering Institute of High Technologies, in Bukhara region, died after he was hit by a tractor on his 8 Barno Anwar, “Шаҳрисабзликмарҳумтеримчинингоиласиадолаткутмоқда,” Ozodlik.org, 15 October 2012, available at http://...

    WB Inspection Panel - Uzbekistan - 2013
  12. Complaint > Maple Energy-01/Nuevo Sucre and Canaan

    Filing: English

    ...unknown illness. His symptoms were extreme stomach pain and vomiting. The doctors in the hospital performed blood tests and they were negative for any known illnesses. Leonardo Tuesta died an excruciatingly painful death in a Contamana hospital, 14 hours after becoming violently ill.75 ii. Liz Charo Buenapico Maldonado, age 12, in severe pain, near death Liz Charo Buenapico Maldonado is 12-years old.76 Before the 2009 oil spills, community members describe her...

    IFC Compliance Advisor/Ombudsman - Peru - 2010
  13. Complaint > EPS Kolubara Environmental Improvement

    Filing: Complaint

    ...unknown whether the Project group acted at all. [27] The third stage of policy of MB Kolubara and EPS regarding Vreoci, from mid 2010 to now, began with the decision of the Council of MZ Vreoci from June 28, 2010 to suspend its participation in the Committee for monitoring of Vreoci resettlement and in the Committee for monitoring the Vreoci graveyard relocation. The decision was taken at a citizens' gathering attended by hundreds of citizens and a large number of members of ES "Vreoci". With th...

    EBRD Project Complaint Mechanism - Serbia
  14. Complaint > Vishnugad Pipalkoti Hydro Electric Project

    Filing: Request for Inspection (English)

    ...Unknown (3). Total 11 2 Rishikesh 93 Dehra Dun (8), Tehri Bihar (2); Chandigarh 34 38 (4), Pauri (3), Roorkee (3), Delhi (4), Haryana (1), Haridwar (2), (2), Himachal Pradesh Udham Singh Nagar (2), Maharashtra (1), (1), Uttarkashi (1), Punjab (2), Rajasthan ...

    WB Inspection Panel - India - 2012
  15. Complaint > Water and Sanitation Service Improvement Project and Water and Sanitation Service Improvement Project - Additional Financing

    Filing: 115-Request for Inspection-26Nov2016

    ...Unknown MESCO 0.4 Maragua Maragua 3.68 Unknown (1) NOTE : TANA HEP STATION ALSO HAS AN INTAKE ON THE TANA RIVER DRIVING A SEPARATE SET OF TURBINES WITH 8MW INSTALLED CAPACITY. Source: TNWSP – Northern Collector Feasibility Study Report by Howard Humphreys, 1998 Wanjii hydroelectric power plant is located near Murang’a town approximately 90km from Nairobi and comprises four horizontally mounted turbine generat...

    WB Inspection Panel - Kenya - 2017
  16. Complaint > Productive Infrastructure Program - Request II: Caracol Industrial Park (MICI)

    Filing: Complaint

    ...unknown. HA-T1179 is meant to assess water availability, quality, and an integrated water resources management in Northern Haiti: HA-L1101 ESS ¶¶2.7-2.8, 4.16-4.17. 339 ActionAid (2015), p. 13: “residents complained that too much water was being captured in the park in light of the 2014 drought.” In an interview, Ilna St Jean reported that a nearby well has run dry and that there is less water in the Trou-du-Nord river, impacting fish (11 July 2016, available on request). 340 See footnot...

    IDB Independent Consultation and Investigation Mechanism - Haiti - 2017
  17. Complaint > Kosovo Power Project (Proposed)

    Filing: 78-Request for Inspection (English)

    ...unknown   and   that   the   per   capita   GNI   for   Kosovo   is   so   low   (i.e.,   $3,300   according   to   IFC’s   Doing   Business   2012),   this   method   was   determined   not   to   provide  an  accurate  estimate.   4  Based  on  an  analysis  carried  out  by  Vattenfall  of  the  new  mine  to  serve  the  new  power  station  with  600MW  capacity.  It  shows  an ...

    WB Inspection Panel - Kosovo - 2012
  18. Complaint > Rio Bogota Environmental Recuperation and Flood Control Project

    Filing: 108-Request for Inspection

    ...unknown. That flaw affects the evaluation of negative impacts and compensation, for without an in-depth study on wildlife it is impossible to know the negative impacts of the plant expansion project and the Metropolitan Park, including the transfer of wildlife and the determination of whether the compensation proposal can actually repair the environmental losses. The visits made to the community have allowed us to see many curis, nests and droppings of this native species of the wetlands of Bogo...

    WB Inspection Panel - Colombia - 2016
Previous | Next