Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

369 Results

Top Results By:

Show All

  1. Complaint > Benban Solar-04

    Eligibility: CAO ASSESSMENT REPORT

    ...Climate Change Conference (COP27) in Egypt, the team did not conduct an assessment trip to the project site. The mediator communicated with the Parties and collected information through in-depth telephone conversations. This report summarizes the views heard by the CAO team from the parties and describes the next steps based on the decisions taken by the complainant and Benban Solar Park. On November 22, 2022, CAO extended the assessment period for 30 business days as per CAO Policy para. ...

    IFC Compliance Advisor/Ombudsman - Egypt - 2022
  2. Complaint > Delhi-Meerut Regional Rapid Transit System Investment Project

    Dispute Resolution: Review and Assessment & Problem-Solving Report

    ...climate change mitigation, resulting in a livable city environment. 2. The proposed RRTS (Delhi–Ghaziabad–Meerut) corridor connecting Delhi with Meerut in Uttar Pradesh will be a rapid railway system, built on elevated viaducts and underground in heavily populated areas. As per the final alignment, out of the total length of 82.15 kilometers (km), 14.15 km will be an underground section, and the remaining 68 km will be an elevated section. A stabling yard near Sarai Kale Khan (Jangpura) an...

    ADB Special Project Facilitator and Compliance Review Panel - India - 2025
  3. Complaint > GCF-EBRD Egypt Renewable Energy Financing Framework

    Monitoring: Problem Solving Monitoring Report on IRM

    ...climate.fund/document/2019-procedures-and-guidelines-irm 2 The problem-solving agreement is available at: https://irm.greenclimate.fund/sites/default/files/case/irm-c-0009- egypt-community-complaint-final-agreement-web.pdf 3 The complaint is available at: https://irm.greenclimate.fund/sites/default/files/case/complaint-text-c0009- redacted-egypt-redacted.pdf 4 As per the problem solving agreement (Section A6), the parties are “[…] the Benban Solar Developers Association (“BSDA”), as the gener...

    GCF Independent Redress Mechanism - Egypt - 2025
  4. Complaint > Boosting Human Capital and Productivity Development Policy Financing with a Deferred Drawdown Option

    Registration: Notice of Non-Registration

    ...changed to only include companies that repeat infractions within the same six-month period, so that “[e]very six months their slate is wiped clean, and infractions committed more than six months ago are forgotten.” 12 • The shortened review period for environmental assessments to 45 days and changes in land policies introduced in Articles 20 to 22 of the law have “reduced incentives for oil companies to strictly comply with environmental ...

    WB Inspection Panel - Peru - 2017
  5. Complaint > Interagua-01/Guayaquil

    Filing: English Part 2

    ...change Interagua’s plans radically until the end of the quinquennium. It is assumed that quinquennial evaluation offers all the necessary opportunities to evaluate those aspects and change plans according to results. This strategy worries us, owing to the implication that precious time will be lost in meeting quality goals, without systematic changes in the provision of services, particularly those of supply of potable water, which are only requested and made every five years. From this p...

    IFC Compliance Advisor/Ombudsman - Ecuador
  6. Complaint > Smallholder Agriculture Development Project

    Filing: 62-Request for Inspection (English)

    ...change mitigation: Given the calamity of global warming and climate change Impact on environment, Inff8structure, livelihood, medical prosperity, oil palm expansion will continue to aeate many ecological foot prints. Biofuel or agrofuells not the answer to mitigating the reduction In rising global carbon gases and other greenhouse gases emissions Into the atmosphere. Continuous forest ciearances for 011 palm expansion would oontlnue to compound and exacerbate the emission of carbon g...

    WB Inspection Panel - Papua New Guinea - 2009
  7. Complaint > Quilleco Hydropower Project

    Management Response: 67-Management Response (English)

    ...Climate Change WCD World Commission on Dams iii Chile iv Quilleco and Laja Projects EXECUTIVE SUMMARY i. On June 18, 2010, the Inspection Panel registered a Request for Inspection concerning the Quilleco Hydropower Project and the Laja Hydroelectric Project in Chile. The Request was submitted by residents of Tucapel, Santa Barbara, Ralc...

    WB Inspection Panel - Chile - 2010
  8. Complaint > Second National Water Development Project - AdditionalFinancing

    Filing: 86-Request for Inspection (English)

    ...climate changes, desertification and increased soil salinity, deforestation and loss of biodiversity;23 (f) 22 See footnote 5 above, Agenda 21, chaps. 5 ,7 and 18; and the World Summit on Sustainable Development, Plan of Implementation (2002), paras. 6 (a), (l) and (m), 7, 36 and 38. 23 See the Convention on Biological Diversity, the Convention to Combat Desertification, the United Nations Framework Convention on Climate Change, and subsequent ...

    WB Inspection Panel - Malawi - 2013
  9. Complaint > Productive and Tourism Infrastructure Program for the Province of Rio Negro

    Dispute Resolution: Consultation Phase Report Public Disclosure

    ...changed, and that, going forward, these alterations could cause a further drop in sales and even business closures. The Requesters also complained of a lack of access to information regarding the work, the execution timeline, and changes in vehicle and pedestrian traffic patterns during construction. During the Eligibility Stage, the MICI conducted a mission to get a better understanding of the allegations set out in the Request and the planned redevelopment work in Mitre Street. During the miss...

    IDB Independent Consultation and Investigation Mechanism - Argentina - 2019
  10. Complaint > Southeast Europe Equity Fund II

    Eligibility: Eligibility Assessment Report for CR

    ...change Square London EC2A 2JN Telephone: +44 (0)20 7338 6000 Fax: +44 (0)20 7338 7633 Email: pcm@ebrd.com  http://www.ebrd.com/work-with-us/project-finance/project-complaint-mechanism.html How to submit a Complaint to the PCM Complaints about the environmental and social performance of the EBRD can be submitted by email, telephone or in writing at the above address, or via the online form at:  http://www.ebrd.com/work-with-us/project-finance/project-complaint-mechanism/submit-a- com...

    EBRD Independent Project Accountability Mechanism - Regional
  11. Complaint > Albania Hydros-01/Tirana

    Appraisal: CAO Compliance Appraisal of IFC advisory service project: Albania Hydros. March 18, 2014

    ...change of ownership of the HPPs was not expected to lead to a change in domestic energy supply and demand. Rather, their refurbishment is likely to increase the amount of energy produced. In addition, it needs to be noted that the 13 Article 1 of the Articles of Agreement which states that IFC’s purpose is to “further economic development by encouraging growth of productive private enterprises in member countries” is cited in this respect. 14 EDEN, Letter of Comp...

    IFC Compliance Advisor/Ombudsman - Albania - 2014
  12. Complaint > Western Poverty Reduction Project

    Eligibility: 16-Management Report and Recommendation (English)

    ...Climate • Agricultural and Livestock Climate Resources Analysis of Qinghai and Their Zoning, 1985 by Qinghai Research Institute of Meteorology Sciences • Climate Observation Information, 1990-1996 Hydrology • Soil and Water Conservation Program of the Typical Watersheds in Loess Plateau Area of East Qinghai, 1986, by Qinghai Provincial Water Conservancy Department* • Qinghai Stat...

    WB Inspection Panel - China - 1999
  13. Complaint > Proposed Kosovo Power Project and Second Additional Financing Energy Sector Clean-up and Land Reclamation Project

    Compliance Report: 103-Inspection Panel Investigation Report(English)

    ...Climate Change SMELT Stepwise Mining Expansion and Land Take TA Technical Assistance ToR Terms of Reference UNMIK United Nations Interim Administration Mission in Kosovo USAID United States Agency for International Development US$ United States Dollar WBG World Bank Group ii Table of Contents Acknowledgements.......................................................

    WB Inspection Panel - Kosovo - 2015
  14. Complaint > Togo LCT-01/Lome

    Compliance Report: English

    ...changes to the sedimentary dynamics in the Gulf of Guinea. Impacts can be seen from the eastern coast of Ghana to Benin, including along the entire coast of Togo. Other factors such as exceptional natural events and climate change, as well as the specific geomorphology of the coast, are acknowledged as contributing to coastal erosion. In the past decade, the Government of Togo has developed a national approach to address the issue of coastal erosion. As part of the construction of the new ...

    IFC Compliance Advisor/Ombudsman - Togo
  15. Complaint > Rural Land Titling & Registration Project in Peru - Third Phase

    Dispute Resolution: Consultation Phase Report Public Disclosure

    ...changes in staffing, from the minister to the director of the execution unit, with whom the MICI has established channels of communication on each occasion, to actively engage them in the process. 2.12 The IDB moved ahead with a change in the Project Team Leader, and the MICI brought on a new case officer for the process, while the position of Consultation Phase Coordinator was left vacant.9 There was a change in the presidency of AIDESEP and in the tec...

    IDB Independent Consultation and Investigation Mechanism - Peru - 2017
  16. Complaint > Kenya Energy Sector Recovery Project

    Filing: 79-Request for Inspection (English)

    ...climate changes to a more drought-prone regime? Over the past few months, a private company has systematically destroyed the Chalbi wetland in preparation for their proposed development. Kara and Green Belt Movement objections have been disregarded by the developer and a site house haS been constructed and a bore-hole drilled despite, it is believed, that there is no such provision for a borehole within the Nema approved EIA. Residents' opinions have not been sought and Nema secretly appro...

    WB Inspection Panel - Kenya - 2012
  17. Complaint > National Drainage Program Project

    Eligibility: 34-Eligibility Report (English)

    ...climates near the sea, waterlogging can also produce increased salinity. 8 5. The Indus Basin Irrigation System (IBIS) brought water to the basin but did not have an outlet to the sea to drain off surplus water. 9 In other words, there was an extensive irrigation system, but no corresponding interconnected drainage network. Much of the drainage either stayed in the irrigation system itself or was disbursed into rivers and streams. The reten...

    WB Inspection Panel - Pakistan - 2004
  18. Complaint > South-West Roads: Western Europe-Western China International Transit Corridor (CAREC-1b & 6b) - 1st request

    Management Response: 66-Management Response (English)

    ...changed between the Committee for Roads and representatives of the Coalition of NGOs to discuss issues raised by the local population, particularly changes to the road design along Birlik settlement. This has resulted in the Committee for Roads being more responsive to concerns raised by the public. v South-West Roads Project Management’s Response The Requesters’ claims, accompanied by Management’s ...

    WB Inspection Panel - Kazakhstan - 2010
  19. Complaint > Amaravati Sustainable Capital City Development Project

    Management Response: Management Response

    ...Climate Resilient Flood Mitigation. The objective of this proposed component would be to build sustainable and climate resilient infrastructure in Amaravati City by supporting its integration with the natural surroundings, riverfront, and greenery. This component would finance: (i) flood mitigation works that include improving the carrying capacity of 26.5 km of the Kondaveeti Vagu River and its inflowing streams, including Erravagu, Kootella Vagu,...

    WB Inspection Panel - India - 2017
  20. Complaint > Bridge International Academies-01/Kenya

    Filing: Letter of complaint - Bridge International Academies-01/Kenya - April 2018

    ...climate of fear around its operations, which affects parents, teachers, staff and citizens. BIA has in several instances used the courts to sue over defamation. However, these attempts to obtain gag orders have all failed as BIA has lost these cases so far. Because of these actions, the complainants believe that BIA is using the Kenyan courts to bully and silence critics and competitors. This situation affects not only the involved individuals and organizations, but also creates a climate of...

    IFC Compliance Advisor/Ombudsman - Kenya - 2018